Tech-invite3GPPspaceIETFspace
21222324252627282931323334353637384‑5x

Content for  TS 38.133  Word version:  18.3.0

Top   Top   Up   Prev   None
1…   3…   4…   5…   6…   7…   8…   9…   10…   12…   A…   A.4…   A.5…   A.6…   A.7…   A.8…   A.9…   A.10…   A.11…   A.12…   A.13…   A.14…   A.15…   A.16…   A.17…   A.18…   B…

 

B (Normative)  Conditions for RRM requirements applicability for operating bandsp. 5994

B.1  Conditions for NR RRC_IDLE state mobilityp. 5994

B.2  Conditions for UE measurements procedures and performance requirements in RRC_CONNECTED statep. 5998

B.2.1  Introductionp. 5998

B.2.2  Conditions for NR intra-frequency measurementsp. 6002

B.2.3  Conditions for NR inter-frequency measurementsp. 6003

B.2.4  Conditions for NR L1-RSRP reportingp. 6004

B.2.5  Conditions for RRC connection release with redirection to NRp. 6007

B.2.6Void

B.2.7  Conditions for SRS-RSRP measurementsp. 6008

B.2.8  Conditions for NR L1-SINR reportingp. 6009

B.2.9  Conditions for NR intra-frequency measurements under CCAp. 6014

B.2.10  Conditions for NR inter-frequency measurements under CCAp. 6014

B.2.11  Conditions for NR L1-RSRP reporting under CCAp. 6014

B.2.12  Conditions for NR CSI-RS based intra-frequency measurementsp. 6015

B.2.13  Conditions for NR CSI-RS based inter-frequency measurementsp. 6016

B.2.14  Conditions for NR PRS-based measurementsp. 6018

B.2.15  Conditions for NR intra-frequency measurementsp. 6020

B.2.16  Conditions for NR inter-frequency measurementsp. 6021

B.2.17  Conditions for NR intra-frequency measurements for satellite accessp. 6023

B.2.18  Conditions for NR inter-frequency measurements for satellite accessp. 6024

B.2.19  Conditions for NR L1-RSRP reporting for satellite accessp. 6024

B.2.20  Conditions for RRC connection release with redirection to NR for satellite accessp. 6025

B.3  RRM Requirements Exceptionsp. 6025

B.4  Conditions for V2Xp. 6027

B.5  High level test procedure for SAN RRM testsp. 6028

$  Change historyp. 6029


Up   Top