Tech-invite3GPPspaceIETFspace
21222324252627282931323334353637384‑5x

Content for  TS 38.133  Word version:  18.3.0

Top   Top   Up   Prev   Next
1…   3…   4…   5…   6…   7…   8…   9…   10…   12…   A…   A.4…   A.5…   A.6…   A.7…   A.8…   A.9…   A.10…   A.11…   A.12…   A.13…   A.14…   A.15…   A.16…   A.17…   A.18…   B…

 

4  SA: RRC_IDLE state mobilityp. 96

4.1  Cell Selectionp. 96

4.2  Cell Re-selectionp. 97

4.2.1  Introductionp. 97

4.2.2  Requirementsp. 97

4.2.2.1  UE measurement capabilityp. 97

4.2.2.2  Measurement and evaluation of serving cellp. 97

4.2.2.3  Measurements of intra-frequency NR cellsp. 100

4.2.2.4  Measurements of inter-frequency NR cellsp. 103

4.2.2.5  Measurements of inter-RAT E-UTRAN cellsp. 108

4.2.2.6  Maximum interruption in paging receptionp. 111

4.2.2.7  General requirementsp. 112

4.2.2.8  Minimum requirement at transitionsp. 112

4.2.2.9  Measurements of intra-frequency NR cells for UE configured with relaxed measurement criterionp. 112

4.2.2.10  Measurements of inter-frequency NR cells for UE configured with relaxed measurement criterionp. 118

4.2.2.11  Measurements of inter-RAT E-UTRAN cells for UE configured with relaxed measurement criterionp. 124

4.2A  Cell Re-selection when subject to CCAp. 129

4.2B  Cell Re-selection for RedCapp. 134

4.2B.1  Introductionp. 134

4.2B.2  Requirementsp. 134

4.2B.2.1  UE measurement capability for RedCapp. 134

4.2B.2.2  Measurement and evaluation of serving cell for RedCap UEp. 135

4.2B.2.3  Measurements of intra-frequency NR cells for RedCap UEp. 137

4.2B.2.4  Measurements of inter-frequency NR cells for RedCap UEp. 139

4.2B.2.5  Measurements of inter-RAT E-UTRAN cells for RedCap UEp. 142

4.2B.2.6  Maximum interruption in paging reception for RedCapp. 144

4.2B.2.7  General requirements for RedCapp. 144

4.2B.2.8  Minimum requirement at transitionsp. 145

4.2B.2.9  Measurements of intra-frequency NR cells for UE configured with relaxed measurement criterion for RedCapp. 145

4.2B.2.10  Measurements of inter-frequency NR cells for UE configured with relaxed measurement criterionp. 156

4.2B.2.11  Measurements of inter-RAT E-UTRAN cells for UE configured with relaxed measurement criterionp. 167

4.2C  Cell Re-selection for NR UE for Satellite Accessp. 175

4.2D  Cell Re-selection for ATGp. 183

4.3  Minimization of Drive Tests (MDT)p. 187

4.3C  Minimization of Drive Tests (MDT) for Satellite Accessp. 189

4.4  Idle Mode CA/DC Measurementsp. 191


Up   Top   ToC