Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TS 51.010-1
Word version: 13.11.0
1…
2…
14…
20…
26…
26.7…
26.14…
27…
31…
40…
41…
42…
43…
45…
50…
52…
58a…
60…
80…
A1…
40
GPRS default conditions, message contents and macros
40.1
Default test conditions
40.1a
EC-GSM-IoT Default test conditions
40.2
Default message contents
40.2a
EC-GSM-IoT Default message contents
40.3
Default GPRS Conditions and Message Contents for the Higher Layer Test Cases
40.4
Macros
40.5
Test PDP contexts
...
40
GPRS default conditions, message contents and macros
Word‑p. 3367
40.1
Default test conditions
40.1.1
Default settings for cell A
Word‑p. 3368
40.1.2
Default settings for cell B
Word‑p. 3372
40.1.3
Default settings for cell C
40.1.4
Default settings for cell D
Word‑p. 3373
40.1.5
Default settings for cell E
Word‑p. 3374
40.1.6
Default settings for cell F
Word‑p. 3375
40.1a
EC-GSM-IoT Default test conditions
Word‑p. 3376
40.2
Default message contents
Word‑p. 3377
40.2.1
System Information messages
40.2.1.1
Cell A
40.2.1.2
Cell B
Word‑p. 3381
40.2.1.3
Cell C
Word‑p. 3382
40.2.1.4
Cell D
Word‑p. 3383
40.2.1.5
Cell E
Word‑p. 3385
40.2.1.6
Cell F
Word‑p. 3387
40.2.2
Packet System Information messages on PACCH
Word‑p. 3389
40.2.3
Default contents of Layer 2 messages
Word‑p. 3390
40.2.4
Default contents of Layer 3 messages
Word‑p. 3393
40.2.4.1
ACTIVATE PDP CONTEXT ACCEPT message:
Word‑p. 3394
40.2.4.2
ACTIVATE PDP CONTEXT REJECT message:
40.2.4.3
ATTACH ACCEPT message:
40.2.4.4
ATTACH REJECT message:
40.2.4.5
AUTHENTICATION AND CIPHERING REJECT message:
40.2.4.6
AUTHENTICATION AND CIPHERING REQUEST message:
Word‑p. 3395
40.2.4.7
CHANNEL RELEASE message:
40.2.4.8
DEACTIVATE PDP CONTEXT ACCEPT message:
40.2.4.9
DETACH ACCEPT message (for mobile terminated detach):
40.2.4.10
DETACH REQUEST message (mobile terminated detach):
40.2.4.11
GMM INFORMATION message:
40.2.4.12
GMM STATUS message:
40.2.4.13
IDENTITY REQUEST message:
Word‑p. 3396
40.2.4.14
IMMEDIATE ASSIGNMENT messages
40.2.4.14.1
IMMEDIATE ASSIGNMENT message (Packet Downlink Construction):
40.2.4.14.2
IMMEDIATE ASSIGNMENT message (Packet Uplink construction):
Word‑p. 3397
40.2.4.14.3
IMMEDIATE ASSIGNMENT message (Single block allocation construction):
Word‑p. 3398
40.2.4.15
IMMEDIATE ASSIGNMENT EXTENDED message:
40.2.4.16
IMMEDIATE ASSIGNMENT REJECT message:
Word‑p. 3399
40.2.4.17
MODIFY PDP CONTEXT REQUEST message:
40.2.4.18
PAGING REQUEST TYPE 1 message:
40.2.4.19
PAGING REQUEST TYPE 2 message:
Word‑p. 3400
40.2.4.20
PAGING REQUEST TYPE 3 message:
40.2.4.21
PDCH ASSIGNMENT COMMAND message (downlink):
Word‑p. 3401
40.2.4.22
REQUEST PDP CONTEXT ACTIVATION message (mobile originated detach):
40.2.4.23
ROUTING AREA UPDATE ACCEPT message:
Word‑p. 3402
40.2.4.24
ROUTING AREA UPDATE REJECT message:
40.2.4.25
RR-CELL CHANGE ORDER message:
40.2.4.26
SM STATUS message:
40.2.4.27
DETACH ACCEPT message (for mobile orginated detach):
40.2.4.28
DTM Assignment Command
Word‑p. 3403
40.2.4.29
DTM Reject
Word‑p. 3404
40.2.4.30
Packet Notification
40.2.4.31
Packet Assignment
Word‑p. 3405
40.2.4.32
Assignment Command
Word‑p. 3406
40.2.4.33
Handover Command
40.2.4.34
Physical Information
40.2.4.35
Connect Acknowledge
Word‑p. 3407
40.2.4.36
Location Updating Accept
40.2.4.37
System Information Type 6
40.2.4.38
DTM Information
Word‑p. 3408
40.2.4.39
PS Handover
40.2a
EC-GSM-IoT Default message contents
40.2a.1
EC-GSM-IoT System Information messages
40.2a.1.1
EC System information type 1 (Instance 1)
40.2a.1.2
EC System information type 2 (Instance 1)
Word‑p. 3409
40.2a.1.3
EC System information type 3 (Instance 1)
Word‑p. 3410
40.2a.1.4
EC System information type 4
40.2a.2
EC default contents of Layer 2 messages
40.2a.2.1
EC-PAGING REQUEST
40.2a.2.2
EC-IMMEDIATE ASSIGNMENT TYPE 1
Word‑p. 3411
40.2a.2.3
EC-IMMEDIATE ASSIGNMENT TYPE 2
40.2a.2.4
EC-IMMEDIATE ASSIGNMENT REJECT
Word‑p. 3412
40.2a.2.5
EC-DOWNLINK ASSIGNMENT
40.3
Default GPRS Conditions and Message Contents for the Higher Layer Test Cases
Word‑p. 3413
40.3.1
Default Test Conditions for the Higher Layer Test Cases
40.3.2
Default Message for the Higher Layer Test Cases
40.3.2.1
Default Contents of System Information Messages for the Higher Layer Test Cases
40.3.3
Contents Of Packet System Information Messages for the Higher Layer Test Cases
Word‑p. 3414
40.3.4
Contents of Layer 2 Messages for the Higher Layer Test Cases
40.3.5
Contents of Layer 3 Messages for the Higher Layer Test Cases
40.3.6
Timer tolerance for higher layer test cases
Word‑p. 3415
40.4
Macros
40.4.1
Overview
40.4.1.1
Definition
40.4.1.2
Syntax
40.4.1.2.1
Message contents
40.4.1.2.2
Message sequence
40.4.2
Default message contents
Word‑p. 3416
40.4.3
Macro message sequences
Word‑p. 3417
40.4.3.1
Acknowledged downlink data
40.4.3.2
Classmark and measurement
40.4.3.3
Downlink data
40.4.3.4
Downlink data transfer
40.4.3.5
Measurement reporting
Word‑p. 3418
40.4.3.6
Uplink data transfer
40.4.3.7
Uplink dynamic allocation one phase access
Word‑p. 3419
40.4.3.8
Uplink dynamic allocation one phase access with contention resolution
40.4.3.9
Uplink dynamic allocation two phase access
Word‑p. 3420
40.4.3.10
Completion of uplink RLC data block transfer
40.4.3.11
Void
40.4.3.12
Void
40.4.3.13
Void
40.4.3.14
Downlink TBF establishment
Word‑p. 3422
40.4.3.15
PDP Context Activation
40.4.3.16
PDP Context Deactivation
40.4.3.17
Inter-SGSN Routing Area Update
Word‑p. 3423
40.4.3.17a
Inter-SGSN Routing Area Update - with PSHO
Word‑p. 3424
40.4.3.18
PDP Context Modification
40.4.3.19
Location Update Procedure
Word‑p. 3425
40.4.3.20
MT Call in GPRS cell
40.4.3.21
Uplink data
Word‑p. 3427
40.4.3.22
Bring MS in the active state (U10)
Word‑p. 3428
40.4.3.23
Completion of uplink RLC data block transfer in extended dynamic mode
Word‑p. 3429
40.5
Test PDP contexts