Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TS 51.010-1
Word version: 13.11.0
1…
2…
14…
20…
26…
26.7…
26.14…
27…
31…
40…
41…
42…
43…
45…
50…
52…
58a…
60…
80…
A1…
26.14
VGCS and VBS Tests
26.15
SoLSA signalling
26.16
Adaptive Multi Rate Signalling
26.17
Adaptive Multi Rate Signalling - 8PSK
26.18
Dynamic ARFCN mapping tests
26.19
AMR WB - signalling
26.20
Enhanced Power Control
26.21
VAMOS Signalling
26.22
Test of other features
...
26.14
VGCS and VBS Tests
Word‑p. 2394
26.14.1
VGCS-VBS / Notification
Word‑p. 2395
26.14.1.1
VGCS-VBS / Notification / notification indication
26.14.1.2
VGCS-VBS / Notification / NCH position
Word‑p. 2399
26.14.1.3
VGCS-VBS / Notification / Reduced NCH monitoring
Word‑p. 2400
26.14.1.4
VGCS-VBS / Notification / Limited Service state
Word‑p. 2405
26.14.2
VGCS-VBS / Paging
Word‑p. 2407
26.14.2.1
VGCS-VBS / Paging / Paging indication
26.14.2.2
VGCS-VBS / Paging / Notification
Word‑p. 2410
26.14.3
VGCS-VBS / RR Procedures
Word‑p. 2414
26.14.3.1
VGCS-VBS / RR Procedures / frequency redefinition
26.14.3.2
VGCS-VBS / RR Procedures / assignment
Word‑p. 2419
26.14.3.3
VGCS-VBS / RR Procedures / handover / successful in group transmit mode
Word‑p. 2423
26.14.3.4
VGCS-VBS / RR Procedures / handover / successful at group call establishment
Word‑p. 2428
26.14.3.5
VGCS-VBS / RR Procedures / handover / failure
Word‑p. 2434
26.14.3.6
VGCS-VBS / RR / Measurement Report
Word‑p. 2435
26.14.3.6.1
Measurement / all neighbours present
26.14.4
VGCS-VBS / Uplink Access and Uplink Reply Procedures
Word‑p. 2439
26.14.4.1
VGCS-VBS / Uplink Access / uplink investigation
26.14.4.2
Uplink Access / uplink access procedure
Word‑p. 2441
26.14.4.3
VGCS-VBS / Uplink Reply in VGCS receive mode
Word‑p. 2443
26.14.5
VGCS-VBS / Leaving Group Receive or Group Transmit Mode
Word‑p. 2445
26.14.5.1
VGCS-VBS / Leaving group receive mode
26.14.5.2
VGCS-VBS / Leaving group transmit mode
Word‑p. 2447
26.14.6
VGCS-VBS / GCC-BCC Procedures
Word‑p. 2449
26.14.6.1
VGCS-VBS / GCC-BCC Procedures / MO call establishment
26.14.6.2
VGCS-VBS / GCC-BCC Procedures / Transaction Identifier
Word‑p. 2452
26.14.6.3
VGCS-VBS / GCC-BCC Procedures / Call Termination / originator / group transmit mode
Word‑p. 2453
26.14.6.4
VGCS-VBS / GCC-BCC Procedures / Call Termination / originator in group receive mode
Word‑p. 2455
26.14.6.5
VGCS-VBS / GCC-BCC Procedures / Call Termination / not originator
Word‑p. 2457
26.14.6.6
VGCS-VBS / GCC-BCC Procedures / GCC states
Word‑p. 2458
26.14.6.7
VGCS-VBS / GCC-BCC Procedures / BCC states
Word‑p. 2461
26.14.7
VGCS-VBS / Error Handling
Word‑p. 2462
26.14.7.1
VGCS-VBS / Error Handling / short message length, unknown message type and TI
26.14.7.2
VGCS-VBS / Error Handling / incorrect information elements
Word‑p. 2466
26.14.7.3
VGCS-VBS / Messages not addressing VGCS receive mode
Word‑p. 2470
26.14.8
VGCS-VBS / Structured Procedures
Word‑p. 2471
26.14.8.1
VGCS-VBS / Structured Procedures / Very early and early assignment
26.14.9
VGCS-VBS / Cell change
Word‑p. 2474
26.14.9.1
VGCS-VBS / Cell Change / Same LA
26.14.9.2
VGCS-VBS / Cell Change / Different LA
Word‑p. 2477
26.14.9.3
VGCS-VBS / Cell Change / Different PLMN
Word‑p. 2480
26.14.10
VGCS-VBS / Default Message Contents
Word‑p. 2483
26.14.11
VGCS-VBS / User-to-Dispatcher Information
Word‑p. 2487
26.14.11.1
VGCS-VBS / User-to-Dispatcher Information / BCC MO call
26.14.11.2
VGCS-VBS / User-to-Dispatcher information / GCC MO call
Word‑p. 2489
26.14.11.3
VGCS-VBS / User-to-Dispatcher information / Compressed user information in VBS fast call set-up
Word‑p. 2491
26.14.11.4
VGCS-VBS / User-to-Dispatcher information / Compressed User-to-Dispatcher information in VGCS fast call set-up
Word‑p. 2493
26.15
SoLSA signalling
Word‑p. 2495
26.15.1
General considerations
26.15.1.1
Default message content
26.15.1.2
General initial conditions for SIM card
Word‑p. 2496
26.15.2
SoLSA signalling / RR
26.15.2.1
SoLSA signalling / RR / classmark interrogation
26.15.3
SoLSA signalling / MM
Word‑p. 2498
26.15.3.1
SoLSA signalling / MM / location updating
26.15.3.1.1
Location updating / accepted
Word‑p. 2499
26.15.3.2
SoLSA signalling / MM / MM information
Word‑p. 2502
26.15.4
SoLSA signalling / CC
Word‑p. 2505
26.15.4.1
SoLSA signalling / CC / call re-establishment / call present
26.15.5
SoLSA signalling / structured procedures
Word‑p. 2508
26.15.5.1
SoLSA signalling / structured procedures / MS originated call / early assignment
26.15.5.2
SoLSA signalling / structured procedures / MS originated call / late assignment
Word‑p. 2511
26.15.5.3
SoLSA signalling / structured procedures / MS terminated call / early assignment
Word‑p. 2514
26.15.5.4
SoLSA signalling / structured procedures / MS terminated call / late assignment
Word‑p. 2517
26.15.5.5
SoLSA signalling / structured procedures / emergency call / idle updated
Word‑p. 2520
26.15.5.6
SoLSA signalling / structured procedures / emergency call / idle, no IMSI
Word‑p. 2523
26.16
Adaptive Multi Rate Signalling
Word‑p. 2526
26.16.0
Default contents of layer 3 messages for AMR signalling tests
26.16.1
Void
26.16.2
Inband Signalling, Uplink Codec Adaptation
26.16.3
Structured procedures / MS terminated call / early assignment / no initial codec mode
Word‑p. 2529
26.16.3a
Structured procedures / MS terminated call / early assignment / specified initial codec mode
Word‑p. 2532
26.16.4
Structured procedures / MS originated call / late assignment / specified initial codec mode
Word‑p. 2535
26.16.4a
Structured procedures / MS originated call / late assignment / no initial codec mode
Word‑p. 2538
26.16.5
AMR signalling / Handover / active call / successful case
Word‑p. 2541
26.16.6
Structured procedures / emergency call
Word‑p. 2557
26.16.7
AMR Signalling / Directed Retry / Mobile Originated Call
Word‑p. 2559
26.16.8
AMR Signalling / Directed Retry / Mobile Terminated Call
Word‑p. 2563
26.16.9
AMR RATSCCH Protocol
Word‑p. 2569
26.16.9.1
AMR Configuration Change (normal)
26.16.9.2
AMR Configuration Change (abnormal)
Word‑p. 2572
26.16.9.3
Codec Mode Phase Change (normal)
Word‑p. 2574
26.16.9.4
Codec Mode Phase Change (abnormal)
Word‑p. 2576
26.16.9.5
Threshold Change (normal)
Word‑p. 2577
26.16.9.6
Threshold Change (abnormal)
Word‑p. 2579
26.16.9.7
Unknown RATSCCH REQ Message
Word‑p. 2581
26.16.9.8
Ignore subsequent REQ prior to expiry of REQ_Activation counter
Word‑p. 2583
26.16.9.9
Initiation of Transaction with ACK_ERR or ACK_UNKNOWN
Word‑p. 2586
26.16.9.10
Inversion of the Phase of the CMR/CMI
Word‑p. 2587
26.16.9.11
Change of Active Codec Set
Word‑p. 2590
26.16.9.12
Void
26.16.10
AMR signalling/ test of the channel mode modify procedure
Word‑p. 2594
26.16.11
Handover / layer 1 failure
Word‑p. 2597
26.17
Adaptive Multi Rate Signalling - 8PSK
Word‑p. 2601
26.17.1
Void
26.17.2
Inband Signalling, Uplink Codec Adaptation
26.17.3
8-PSK AMR HR / Structured procedures / MS terminated call / early assignment / no initial codec mode
Word‑p. 2603
26.17.3a
8-PSK AMR HR / Structured procedures / MS terminated call / early assignment / specified initial codec mode
Word‑p. 2606
26.17.4
8-PSK AMR HR / Structured procedures / MS originated call / late assignment / specified initial codec mode
Word‑p. 2609
26.17.4a
8-PSK AMR HR / Structured procedures / MS originated call / late assignment / no initial codec mode
Word‑p. 2612
26.17.5
Void
26.17.6
8-PSK AMR HR / Structured procedures / emergency call
Word‑p. 2614
26.17.7
Void
26.17.8
Void
26.17.9
8-PSK AMR HR / RATSCCH Protocol
Word‑p. 2617
26.17.9.1
AMR Configuration Change (normal)
26.17.9.2
AMR Configuration Change (abnormal)
Word‑p. 2619
26.17.9.3
Codec Mode Phase Change (normal)
Word‑p. 2621
26.17.9.4
Codec Mode Phase Change (abnormal)
Word‑p. 2623
26.17.9.5
Threshold Change (normal)
Word‑p. 2625
26.17.9.6
Threshold Change (abnormal)
Word‑p. 2627
26.17.9.7
Unknown RATSCCH REQ Message
Word‑p. 2629
26.17.9.8
Ignore subsequent REQ prior to expiry of REQ_Activation counter
Word‑p. 2631
26.17.9.9
Initiation of Transaction with ACK_ERR or ACK_UNKNOWN
Word‑p. 2634
26.17.9.10
Inversion of the Phase of the CMR/CMI
Word‑p. 2635
26.17.9.11
Change of Active Codec Set
Word‑p. 2638
26.17.10
8-PSK AMR HR signalling/ test of the channel mode modify procedure
Word‑p. 2642
26.17.10.1
Void
26.17.10.2
8-PSK AMR HR signalling/ test of the channel mode modify procedure/ half rate
26.18
Dynamic ARFCN mapping tests
Word‑p. 2644
26.18.1
Control of dynamic ARFCN mapping with SI14 and SI15
26.19
AMR WB - signalling
Word‑p. 2648
26.19.1
Reserved for future use
26.19.2
Reserved for future use
26.19.3
Reserved for future use
26.19.3a
WB AMR / Structured procedures / MS terminated call / early assignment / specified initial codec mode
26.19.4
Reserved for future use
Word‑p. 2652
26.19.5
WB AMR / Adaptive Multi Rate Signalling / AMR signalling / Handover / active call / successful case
26.19.6
Reserved for future use
Word‑p. 2674
26.19.7
Reserved for future use
26.19.8
Reserved for future use
26.19.9
WB AMR RATSCCH Protocol
26.19.9.1
WB AMR Configuration Change (normal)
26.19.9.2
AMR WB Configuration Change (abnormal)
Word‑p. 2677
26.19.9.3
Codec Mode Phase Change (normal)
Word‑p. 2679
26.19.9.4
Reserved for future use
Word‑p. 2681
26.19.9.5
Threshold Change (normal)
26.19.9.6
Reserved for future use
Word‑p. 2684
26.19.9.7
Reserved for future use
26.19.9.8
Reserved for future use
26.19.9.9
Reserved for future use
26.19.9.10
Inversion of the Phase of the CMR/CMI
26.19.9.11
Change of Active Codec Set
Word‑p. 2687
26.19.10
AMR signalling/ test of the channel mode modify procedure
Word‑p. 2692
26.19.10.1
WB AMR signalling test of the channel mode modify procedure / full rate
26.20
Enhanced Power Control
Word‑p. 2694
26.20.1
Enhanced Power Control / MS Supports EPC
26.21
VAMOS Signalling
Word‑p. 2697
26.21.0
General
26.21.1
VAMOS Signalling / MS originated call FR / TSC assignment in ASSIGNMENT COMMAND
Word‑p. 2698
26.21.2
VAMOS Signalling / MS Terminated call / Channel mode assignment in Channel Mode Modify
Word‑p. 2701
26.21.3
-
Word‑p. 2705
26.21.4
VAMOS Signalling / MS terminated call / Handover to VAMOS mode
26.21.5
VAMOS Signalling / MT VAMOS call / TSC assignment in DTM Assignment Command
Word‑p. 2708
26.21.6
VAMOS Signalling / MS originated call / Handover between different traffic rates
Word‑p. 2712
26.21.7
VAMOS Signalling / Emergency call
Word‑p. 2715
26.21.8
VAMOS Signalling / MS Originated call / Early assignment / Handover to different AMR codec rates
Word‑p. 2718
26.22
Test of other features
Word‑p. 2721
26.22.1
Layer 2 fill bits randomisation