Tech-
invite
3GPP
space
IETF
RFCs
SIP
index
N
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TS 38.214
Word version: 17.4.0
1…
4…
6…
7…
6
Physical uplink shared channel related procedure
6.1
UE procedure for transmitting the physical uplink shared channel
6.2
UE reference signal (RS) procedure
6.3
UE PUSCH frequency hopping procedure
6.4
UE PUSCH preparation procedure time
6
Physical uplink shared channel related procedure
p. 136
6.1
UE procedure for transmitting the physical uplink shared channel
p. 136
6.1.1
Transmission schemes
p. 138
6.1.1.1
Codebook based UL transmission
p. 138
6.1.1.2
Non-Codebook based UL transmission
p. 140
6.1.2
Resource allocation
p. 141
6.1.2.1
Resource allocation in time domain
p. 141
6.1.2.1.1
Determination of the resource allocation table to be used for PUSCH
p. 151
6.1.2.2
Resource allocation in frequency domain
p. 154
6.1.2.2.1
Uplink resource allocation type 0
p. 154
6.1.2.2.2
Uplink resource allocation type 1
p. 155
6.1.2.2.3
Uplink resource allocation type 2
|R16|
p. 156
6.1.2.3
Resource allocation for uplink transmission with configured grant
p. 157
6.1.2.3.1
Transport Block repetition for uplink transmissions of PUSCH repetition Type A with a configured grant
|R17|
p. 160
6.1.2.3.2
Transport Block repetition for uplink transmissions of PUSCH repetition Type B with a configured grant
|R17|
p. 161
6.1.2.3.3
Transport Block repetition for uplink transmissions of TB processing over multiple slots with a configured grant
|R17|
p. 162
6.1.3
UE procedure for applying transform precoding on PUSCH
p. 163
6.1.4
Modulation order, redundancy version and transport block size determination
p. 163
6.1.4.1
Modulation order and target code rate determination
p. 165
6.1.4.2
Transport block size determination
p. 170
6.1.5
Code block group based PUSCH transmission
p. 171
6.1.5.1
UE procedure for grouping of code blocks to code block groups
p. 171
6.1.5.2
UE procedure for transmitting code block group based transmissions
p. 172
6.1.6
Uplink switching
|R16|
p. 172
6.1.6.1
Uplink switching for EN-DC
p. 172
6.1.6.2
Uplink switching for carrier aggregation
p. 173
6.1.6.2.1
Void
6.1.6.3
Uplink switching for supplementary uplink
p. 174
6.1.7
UE procedure for determining time domain windows for bundling DM-RS
|R17|
p. 174
6.2
UE reference signal (RS) procedure
p. 177
6.2.1
UE sounding procedure
p. 177
6.2.1.1
UE SRS frequency hopping procedure
p. 184
6.2.1.2
UE sounding procedure for DL CSI acquisition
p. 184
6.2.1.3
UE sounding procedure between component carriers
p. 189
6.2.1.4
UE sounding procedure for positioning purposes
|R16|
p. 191
6.2.2
UE DM-RS transmission procedure
p. 193
6.2.3
UE PT-RS transmission procedure
p. 194
6.2.3.1
UE PT-RS transmission procedure when transform precoding is not enabled
p. 195
6.2.3.2
UE PT-RS transmission procedure when transform precoding is enabled
p. 197
6.3
UE PUSCH frequency hopping procedure
p. 198
6.3.1
Frequency hopping for PUSCH repetition Type A and for TB processing over multiple slots
|R16|
p. 198
6.3.2
Frequency hopping for PUSCH repetition Type B
|R16|
p. 199
6.4
UE PUSCH preparation procedure time
p. 200