| Figure 4-1 | Overall architecture for separation of gNB-CU-CP and gNB-CU-UP TS 38.401 [2] |
| Figure 4-2 | CP connections involving the AMF, gNB-CU-CP, gNB-CU-UP, and gNB-DUs. |
| Figure A.2.1-1 | Example of gNB-CU-CP Failure Scenarios (A)(B)(C) |
| Figure A.2.2-1 | Example of gNB-CU-CP Failure Scenario (D) |
| Figure A.2.3-1 | Example of gNB-CU-CP Failure Scenario (E) |
| Figure A.7.1-1 | gNB-CU-CP failure scenarios |
| Figure A.8.1-1 | Overall architecture for separation of gNB-CU-CP and gNB-CU-UP |