Tech-invite3GPPspaceIETFspace
21222324252627282931323334353637384‑5x

Content for  TS 37.145-2  Word version:  17.1.0

Top   Top   Up   Prev   Next
1…   2…   6…   7…   8…

 

2  References

3  Definitions, symbols and abbreviationsWord‑p. 17

3.1  Definitions

3.2  SymbolsWord‑p. 21

3.3  AbbreviationsWord‑p. 23

4  General test conditions and declarationsWord‑p. 24

4.1  Measurement uncertainties and test requirements

4.2  Conducted and radiated requirement reference points

4.3  Base station classes for AAS BSWord‑p. 32

4.4  Regional requirements

4.5  Operating bands and band categoriesWord‑p. 34

4.6  Channel arrangements

4.7  Requirements for AAS BS capable of multi-band operation

4.8  AAS BS configurationsWord‑p. 35

4.9  Capability sets

4.10  Manufacturer declarationsWord‑p. 38

4.11  Test signal configurations for testingWord‑p. 45

4.11.1  General

4.11.1A  NR Test signal used to build Test ConfigurationsWord‑p. 46

4.11.2  Test signal configurations

4.11.2.1  ATCR1: UTRA multicarrier operation

4.11.2.2  ANTCR1: UTRA FDD multicarrier non-contiguous operationWord‑p. 47

4.11.2.3  ATCR2: E-UTRA multicarrier operation

4.11.2.4  ANTCR2: E-UTRA multicarrier non-contiguous operationWord‑p. 49

4.11.2.5  ATCR3: UTRA and E-UTRA multi-RAT operation

4.11.2.6  ANTCR3: UTRA and E-UTRA multi-RAT non-contiguous operation

4.11.2.7  ATCR4: Single carrier for receiver tests

11.2.7.4  ATCR4 power allocation

4.11.2.8  ATCR5: MB-MSR operation

4.11.2.9  ATCR6: Single carrier for transmitter testsWord‑p. 54

4.11.2.10  ATCR7: E-UTRA and NR multi RAT operationWord‑p. 55

4.11.2.11  ANTCR7: E-UTRA and NR multi RAT non-contiguous operationWord‑p. 56

4.11.2.12  ATCR8: NR multicarrier operationWord‑p. 57

4.11.2.13  ANTCR8: NR multicarrier non-contiguous operationWord‑p. 58

4.11.2.14  ATCR9: UTRA, E-UTRA and NR multi-RAT operation

4.11.2.15  ANTCR9: UTRA, E-UTRA and NR multi-RAT non-contiguous operation

4.12  RF channels and test models

4.13  Format and interpretation of testsWord‑p. 62

4.14  Reference coordinate systemWord‑p. 63

4.15  Co-location requirementsWord‑p. 64

5  Applicability of RequirementsWord‑p. 66


Up   Top   ToC