Tech-invite   3GPPspecs   Glossaries   IETFRFCs   Groups   SIP   ABNFs   Ti+   Search in Tech-invite

Top   in Index   Prev   Next

TR 32.800 (SA5)
Management Level Procedures
and Interaction with UTRAN

3GPP‑Page   full‑ToC    
use "3GPP‑Page" to get the Word version
for a better overview, the Table of Contents (ToC) is reproduced
V5.0.0 (Wzip)  2002/03  37 p.
V4.0.0  2001/07  37 p.


Rapporteur:  Dr. Boden, Bert

The present document describes procedures needed to manage a UTRAN Radio network. The purpose of these procedures is to ensure that the OAM functions supported via the IRPs and over the Iub interface are sufficient to allow a multi-vendor environment to be realised. To define this scope a proper understanding of the OAM functions in the network manager throughout the Node B is required. This will ensure that all OAM functions requiring interaction with the RNC and Node B are identified and specified accordingly.

The principle objective of this TR is to provide supporting information for the OAM standardisation of a (multi-vendor) UTRAN network.

The actual specification work relating to the OAM interface between Network and Network Manager can be found in TS 32.6xx, TS 32.111-1 and TS 32.104 and for the Iub interface in TS 25.433.

For this reason the TR may contain information or working assumptions which are not a direct part of the specifications, but are essential to the progress and informed decision making.

full Table of Contents for  TR 32.800  Word version:   5.0.0

 

Here   Top

 

1  ScopeWord-p. 5
2  References
3  Definitions and abbreviationsWord-p. 6
4  UTRAN O&MWord-p. 7
5  UTRAN O&M ProceduresWord-p. 9
A  Blocking/Unblocking of Logical Resources (Cells)Word-p. 34
B  Change historyWord-p. 37

Up   Top