Tech-invite3GPPspaceIETFspace
21222324252627282931323334353637384‑5x

Content for  TS 28.510  Word version:  17.0.0

Top   Top   Up   Prev   Next
0…   5…   6…

 

5  Business level requirementsp. 6

5.1  Requirementsp. 6

REQ-NFV_CM-CON-1
EM shall be able to perform necessary virtualized network function configuration due to the VNF lifecycle management from VNFM:
  • Add the VNF as managed node after VNF instantiation.
  • Remove the VNF from managed nodes after VNF termination.
  • Configure the VNF after some VNF LCM operations (i.e. instantiation).
  • Re-configure the VNF after some VNF LCM operations (e.g. scaling, update/upgrade, etc.).
REQ-NFV_CM-CON-2
3GPP management system shall have a capability to create MO(s) corresponding to a VNF instance.
REQ-NFV_CM-CON-3
3GPP management system shall have a capability to configure the MO(s) corresponding to a VNF instance.
REQ-NFV_CM-CON-4
Void
REQ-NFV_CM-CON-5
Void
REQ-NFV_CM-CON-6
Void
REQ-NFV_CM-CON-7
Void
REQ-NFV_CM-CON-8
3GPP management system shall have a capability to delete MOI(s) related to a VNF instance.
REQ-NFV_CM-CON-9
NM shall have a capability retrieving views of virtualized NEs from various management systems (e.g. EM, NFVO).
REQ-NFV_CM-CON-10
3GPP management system shall have a capability to manage bulk creation of MOIs representing NEs whose software components are designed to run on NFVI.
Up

5.2  Actor rolesp. 7

See detailed actors and roles for each use case in clause 5.4.

5.3  Telecommunications resourcesp. 7

See detailed telecommunication resources for each use case in clause 5.4.

5.4  High-level use casesp. 7

5.4.1  Create Managed Object for Network Element in the context of NFVp. 7

Use Case Stage Evolution/Specification <<Uses>> Related use
GoalTo create Managed Object (MO) for a new NE that includes virtualized network functions.
Actors and Roles3GPP management system (EM, NM) creates MO for NE.
NFV MANO system instantiates VNF instance and configures VNF non-application specific parameters for VNF instance.
Telecom resourcesNFV MANO system (NFVO, VNFM), 3GPP management system (EM, NM)
AssumptionsNFV MANO system has already instantiated a VNF instance using the related VNF Package.
Pre conditionsN/A
Begins when Operator has decided to create MO for a new NE.
Step 1 (M)3GPP management system adds the VNF instance as a NE MO. 3GPP management system can configure the VNF instance with application specific parameters during the creation process of NE MO.
Ends whenEnds when all mandatory steps identified above are successfully completed or when an exception occurs.
ExceptionsOne of the steps identified above fails.
Post ConditionsThe MO for a new NE is added into 3GPP management system and is ready for further configuration management (e.g. new or additional application-specific parameters configuration can happen).
Traceability REQ-NFV_CM-CON-2, REQ-NFV_CM-CON-3
Up

5.4.2  Delete MOI(s) for Network Element in the context of NFVp. 8

Use Case Stage Evolution/Specification <<Uses>> Related use
GoalTo delete MOI(s) for a NE that includes virtualized network function.
Actors and Roles3GPP management system (EM, NM) deletes MOI(s) for NE.
Telecom resources3GPP management system (EM, NM).
AssumptionsThe MOI(s) for the NE to be deleted has been created.
Pre conditionsThe NE services have been released.
Begins when Operator has decided to delete the MOI(s) for a NE.
Step 1 (M)3GPP management system deletes the MOI(s) for the subject NE.
Ends whenEnds when all mandatory steps identified above are successfully completed or when an exception occurs.
ExceptionsOne of the steps identified above fails.
Post ConditionsThe MOI(s) for the NE are deleted.
Traceability REQ-NFV_CM-CON-8
Up

5.4.3  Update the configuration parameters corresponding to the subject VNF instance (application part) after a VNF instance is scaledp. 8

Use Case Stage Evolution/Specification <<Uses>> Related use
Goal Update the configuration parameters corresponding to the subject VNF instance (application part) after the VNF is scaled.
Actors and Roles3GPP management system (EM, NM).
Telecom resourcesNFV MANO (NFVO, VNFM), 3GPP management system (EM, NM)
Assumptions
Pre-conditions
Begins when 3GPP management system is aware that the VNF instance has been scaled and determines the configuration parameters need to be updated.
Step 1 (M)3GPP management system updates the configuration parameters corresponding to the subject VNF instance (application part).
Ends when Ends when all steps identified above are completed or when an exception occurs.
ExceptionsOne of the steps identified above fails.
Post-conditionsThe configuration parameters corresponding to the subject VNF instance (application part) are updated.
TraceabilityREQ-NFV_CM-CON-3
Up

5.4.4  Retrieve virtualized NE information by NMp. 9

Use Case Stage Evolution/Specification <<Uses>> Related use
Goal NM updates its view of its managed virtualized NEs.
Actors and RolesNM
Telecom resourcesEM, NFVO.
AssumptionsNone
Pre-conditionsNone
Begins when NM determines a need to update its view of its managed VNFs.
Step 1 (M)NM requests NFVO to provide information of VNFs (see clause 7.3.6 in ETSI GS NFV-IFA 013 [7].
NM requests EM to provide information of virtualized NEs. This information is VNF application-specific.
Step 2 (M)NFVO responds with the information requested. NM updates its view of its managed virtualized NE,
EM responds to NM with the information requested.
Ends whenEnds when all steps identified above are completed or when an exception occurs.
ExceptionsOne of the steps identified above fails.
Post-conditionsNM has the information to update its view of its managed virtualized NEs.
TraceabilityREQ-NFV_CM-CON-9,
Up

Up   Top   ToC