Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 25.931
Word version: 16.0.0
1…
2…
2
References
3
Definitions, abbreviations and notation
4
UTRAN and UE protocol Architecture
5
UTRAN Signalling Procedures
6
Procedures not related to a specific UE (global procedures)
7
Procedures related to a specific UE
$
Change History
2
References
3
Definitions, abbreviations and notation
Word‑p. 8
3.1
Definitions
3.2
Abbreviations
3.3
Notation for the signalling procedures
Word‑p. 10
3.4
Other Notations
Word‑p. 11
4
UTRAN and UE protocol Architecture
Word‑p. 12
4.1
Protocol Architecture
4.2
RANAP Procedures & Messages
4.3
SABP Procedures & Messages
Word‑p. 14
4.4
RNSAP Procedures & Messages
4.5
NBAP Procedures & Messages
Word‑p. 16
4.6
ALCAP
Word‑p. 18
4.6.1
Q.2630.2 (Q.AAL2)
4.7
RRC Procedures & Messages
4.8
BMC Procedures & Messages
Word‑p. 20
4.9
DCH Frame Protocol Messages
4.10
DSCH Frame Protocol Messages
4.11
USCH Frame Protocol Messages
5
UTRAN Signalling Procedures
6
Procedures not related to a specific UE (global procedures)
Word‑p. 21
6.1
System Information Broadcasting
6.2
Service Area Broadcast
7
Procedures related to a specific UE
Word‑p. 22
7.1
Paging
7.1.1
Paging for a UE in RRC Idle Mode and RRC connected mode (CELL_PCH and URA_PCH states)
7.1.2
Paging for a UE in RRC Connected Mode (CELL_DCH and CELL_FACH states)
Word‑p. 23
7.2
NAS Signalling Connection Establishment
Word‑p. 24
7.3
RRC Connection Establishment
7.3.1
DCH Establishment
7.3.2
RACH/FACH Establishment
Word‑p. 26
7.3.3
DCH Establishment with Pre-emption
7.4
RRC Connection Release
Word‑p. 28
7.4.1
DCH Release
7.4.2
Common Transport Channel Release
Word‑p. 29
7.5
RRC Connection Re-establishment
7.5.1
DCH Re-establishment
7.5.1.1
RRC connection Re-establishment (Anchor approach) - DCH Re-establishment
7.5.1.2
RRC Connection Re-establishment with SRNC Relocation - DCH Re-establishment
Word‑p. 31
7.6
Radio Access Bearer Establishment
Word‑p. 32
7.6.1
DCH - DCH Establishment - Synchronised
7.6.2
DCH - DCH Establishment - Unsynchronised
Word‑p. 34
7.6.3
RACH/FACH - DCH Establishment
Word‑p. 36
7.6.4
RACH/FACH - RACH/FACH Establishment
Word‑p. 37
7.7
Radio Access Bearer Release
Word‑p. 38
7.7.1
DCH - DCH Release - Synchronised
7.7.2
DCH - DCH Release - Unsynchronised
Word‑p. 40
7.7.4
RACH/FACH - RACH/FACH Release
Word‑p. 41
7.8
Radio Access Bearer Modification
Word‑p. 42
7.8.1
DCCH on DCH - Synchronised
7.8.1.1
Synchronised DCH modification, Bandwidth increase
Word‑p. 43
7.8.1.2
Synchronised DCH modification, Bandwidth decrease
Word‑p. 45
7.8.2
DCCH on RACH/FACH
Word‑p. 46
7.9
Physical Channel Reconfiguration
Word‑p. 47
7.9.1
Physical Channel Reconfiguration (DCH)
7.9.2
Physical Channel Reconfiguration (CRNC Controlled)
Word‑p. 49
7.10
Soft Handover [FDD]
7.10.1
Radio Link Addition (Branch Addition)
Word‑p. 50
7.10.2
Radio link Deletion (Branch Deletion)
Word‑p. 51
7.10.3
Radio link Addition & Deletion (Branch Addition & Deletion - simultaneously)
Word‑p. 52
7.10.4
DSCH Mobility Procedure in Soft Handover (Moving DSCH within the Active Set)
Word‑p. 53
7.10.5
HS-DSCH Mobility Procedures
Word‑p. 54
7.10.5.1
Intra-Node B synchronised serving HS-DSCH cell change
7.10.5.2
Inter-Node B (intra DRNC) synchronised serving HS-DSCH cell change
Word‑p. 55
7.11
Hard Handover
Word‑p. 56
7.11.1
Backward Hard Handover
7.11.1.1
Hard Handover via Iur (DCH State)
7.11.1.2
Hard Handover with switching in the CN (UE connected to two CN nodes, DCH state)
Word‑p. 60
7.11.1.2.1
Using SRNS Relocation scheme
7.11.1.2.2
Using Enhanced SRNS Relocation
Word‑p. 63
7.11.1.3
Inter-Node B synchronised serving HS-DSCH cell change at hard handover
Word‑p. 64
7.11.1.3.1
Inter-Node B (intra DRNC) synchronised serving HS-DSCH cell change at hard handover
Word‑p. 65
7.11.1.3.2
Inter-Node B (inter DRNC) synchronised serving HS-DSCH cell change at hard handover
Word‑p. 67
7.11.2
Forward Hard Handover
Word‑p. 69
7.11.2.1
Cell Update
7.11.2.1.1
Using Cell Update with SRNS relocation
7.11.2.1.2
Using Enhanced SRNS Relocation
Word‑p. 70
7.11.2.2
Cell Update via Iur without SRNS relocation
7.11.2.3
Cell Update via Iur without SRNS relocation (with C-RNTI reallocation)
Word‑p. 72
7.11.2.4
Cell Update via Iur with USCH/DSCH, without SRNS relocation [TDD]
7.12
URA Update
Word‑p. 74
7.12.1
Inter-RNS URA Update
7.12.1.1
Inter-RNS URA Update using SRNS Relocation
7.12.1.2
Using Enhanced SRNS Relocation
Word‑p. 75
7.12.2
Inter-RNS URA Update via Iur without SRNS relocation
Word‑p. 76
7.12.3
SRNS Relocation (UE connected to two CN nodes)
Word‑p. 77
7.12.3.1
Using SRNS Relocation
7.12.3.2
Using Enhanced SRNS Relocation
Word‑p. 79
7.13
HO & Cell Reselection between UTRAN and GSM/BSS
Word‑p. 81
7.13.1
UTRAN → GSM/BSS
7.13.1.1
UTRAN → GSM/BSS
7.13.1.2
Service Based Intersystem Handover
Word‑p. 83
7.13.1.3
Directed Retry
Word‑p. 84
7.13.2
GSM/BSS → UTRAN
Word‑p. 85
7.13.3
GPRS → UMTS Cell Reselection
Word‑p. 86
7.13.4
UMTS → GPRS Cell Reselection, UE Initiated
7.13.5
UMTS → GPRS Cell Reselection, Network Initiated
Word‑p. 87
7.14
Transport Channel Reconfiguration (DCH to DCH)
Word‑p. 88
7.14.1
Synchronised Transport Channel Reconfiguration
7.14.1.1
Synchronised Reconfiguration, Q.2630.2 modification procedure not used
Word‑p. 89
7.14.1.2
Synchronised Reconfiguration, Bandwidth Increase with Q.2630.2 modification procedure
Word‑p. 90
7.14.1.3
Synchronised Reconfiguration, Bandwidth Decrease with Q.2630.2 modification procedure
Word‑p. 92
7.14.2
Unsynchronised Transport Channel Reconfiguration
Word‑p. 93
7.14.2.1
Unsynchronised Reconfiguration, Q.2630.2 modification procedure not used
7.14.2.2
Unsynchronised Reconfiguration, Bandwidth Increase with Q.2630.2 modification procedure
Word‑p. 94
7.14.2.3
Unsynchronised Reconfiguration, Bandwidth Decrease with Q.2630.2 modification procedure
Word‑p. 95
7.15
Direct Transfer
Word‑p. 96
7.15.1
Uplink Direct Transfer
7.15.2
Downlink Direct Transfer
Word‑p. 97
7.16
Downlink Power Control [FDD]
7.17
Shared Channels Configuration and Capacity Allocation
Word‑p. 98
7.17.1
USCH/DSCH Configuration and Capacity Allocation [TDD]
7.17.2
HS-DSCH Configuration and Capacity Allocation
Word‑p. 100
7.18
Channel and Mobile State Switching on Iur
Word‑p. 101
7.18.1
General Description
7.18.2
Switching from Cell_FACH to Cell_DCH State
7.18.3
Switching from Cell_DCH to Cell_FACH State
Word‑p. 103
7.19
MBMS Specific Procedures
Word‑p. 105
7.19.1
MBMS Service Activation
7.19.2
MBMS Session Start
Word‑p. 107
7.19.2a
MBMS Session Start for UE in Cell-DCH in DRNC
Word‑p. 109
7.19.3
MBMS UE Mobility from a PTP to PTM cell
Word‑p. 111
7.19.4
MBMS UE Mobility from PTM cell to PTP cell
Word‑p. 113
7.19.5
MBMS Session Stop and Service termination
Word‑p. 114
7.19.6
RAU during MBMS Session
Word‑p. 117
7.20
E-DCH Specific Scenarios
Word‑p. 118
7.20.1
E-DCH Establishment and EDCH TTI Reconfiguration
7.20.1.1
FDD
7.20.1.2
TDD
Word‑p. 120
7.20.2
Soft Handover [FDD]
Word‑p. 122
7.20.3
Intra-Node B synchronised serving E-DCH cell change [FDD]
Word‑p. 123
7.20.4
Inter-Node B (intra DRNC) synchronised serving E-DCH cell change [FDD]
Word‑p. 124
7.20.5
Hard Handover
Word‑p. 126
$
Change History
Word‑p. 130