Tech-invite3GPPspaceIETFspace
21222324252627282931323334353637384‑5x
Top   in Index   None   Next

TS 43.005
Technical Performance Objectives

V19.0.0 (PDF)  2025/09  23 p.
V18.0.0  2024/03  23 p.
V17.0.0  2022/03  23 p.
V16.0.0  2020/06  23 p.
V15.0.0  2018/06  23 p.
V14.0.0  2017/03  23 p.
V13.0.0  2015/12  23 p.
V12.0.0  2014/09  23 p.
V11.0.0  2012/09  23 p.
V10.0.0  2011/04  23 p.
V9.0.0  2009/12  23 p.
V8.0.0  2008/12  22 p.
V7.0.0  2007/07  22 p.
V6.0.0  2005/01  22 p.
V5.0.0  2002/07  22 p.
V4.0.0  2001/04  22 p.
GSM Rel-99 v8.0.0  2000/06  22 p.
GSM Rel-98 v7.0.0  1999/06  22 p.
GSM Rel-97 v6.0.0  1998/10  22 p.
GSM Rel-96 v5.0.0  1996/10  24 p.
GSM Phase-2 v4.1.0  1996/06  23 p.
GSM Phase-1 v3.2.0  1991/10  23 p.
Rapporteur:
Mr. Hietalahti, Hannu
Nokia Networks Oy

full Table of Contents for  TS 43.005  Word version:  19.0.0

each clause number in 'red' refers to the equivalent title in the Partial Content
Here   Top
1Scope  p. 5
1.1References  p. 5
1.2Abbreviations  p. 6
2General  p. 6
3Performance design objectives  p. 6
3.1General  p. 6
3.2MSCs  p. 6
3.2.1Reference loads  p. 6
3.2.1.1Reference load on incoming interexchange circuits  p. 6
3.2.1.2Reference load for MS calls  p. 6
3.2.1.3Impact of supplementary services  p. 7
3.2.2Inadequately handled call attempts  p. 7
3.2.2.1Definition  p. 7
3.2.2.2Probability of inadequately handled call attempts occurring  p. 7
3.2.3Delay probability  p. 8
3.2.3.1User signalling acknowledgement delay  p. 8
3.2.3.2Signalling transfer delay  p. 8
3.2.3.3Through connection delay  p. 8
3.2.3.4Incoming call indication sending delay - (for terminating and internal traffic connections)  p. 9
3.2.3.5Connection release delay  p. 10
3.2.3.6Call clearing delay  p. 10
3.2.3.7Timing for start of charging (circuit switched calls)  p. 10
3.2.3.8Call set-up delay  p. 10
3.2.3.9Handover delay  p. 10
3.2.3.10Off-air-call-set-up (OACSU) delay  p. 11
3.2.3.11Discontinuous reception mode delay  p. 11
3.2.4Call processing performance objectives  p. 11
3.2.4.1Premature release  p. 11
3.2.4.2Release failure  p. 11
3.2.4.3Incorrect charging or accounting  p. 11
3.2.4.4Misrouting  p. 11
3.2.4.5No tone  p. 11
3.2.4.6Other failures  p. 12
3.2.4.7Transmission performance  p. 12
3.2.4.8Slip rate  p. 12
3.2.5MSC performance during overload conditions  p. 12
3.3Performance design objectives for HLRs  p. 12
3.3.1Reference loads  p. 12
3.3.2Objectives  p. 12
3.4Performance design objectives for VLRs  p. 12
3.4.1Reference loads  p. 12
3.4.2Objectives  p. 12
4Transmission characteristics  p. 13
4.1General  p. 13
4.1.1BS-MSC path  p. 13
4.1.2MSC  p. 13
4.2System delay distribution  p. 13
4.2.1Speech channel delay  p. 13
4.2.2Data channel delay  p. 15
$Change Request History  p. 20

Up   Top