Tech-
invite
3GPP
space
IETF
space
◀
▶
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
TS 43.005
Technical Performance Objectives
3GPP‑Page
ETSI‑search
fToC
↓
Partial Content
→
V19.0.0 (PDF)
2025/09 23 p.
V18.0.0
2024/03 23 p.
V17.0.0
2022/03 23 p.
V16.0.0
2020/06 23 p.
V15.0.0
2018/06 23 p.
V14.0.0
2017/03 23 p.
V13.0.0
2015/12 23 p.
V12.0.0
2014/09 23 p.
V11.0.0
2012/09 23 p.
V10.0.0
2011/04 23 p.
V9.0.0
2009/12 23 p.
V8.0.0
2008/12 22 p.
V7.0.0
2007/07 22 p.
V6.0.0
2005/01 22 p.
V5.0.0
2002/07 22 p.
V4.0.0
2001/04 22 p.
GSM Rel-99 v8.0.0
2000/06 22 p.
GSM Rel-98 v7.0.0
1999/06 22 p.
GSM Rel-97 v6.0.0
1998/10 22 p.
GSM Rel-96 v5.0.0
1996/10 24 p.
GSM Phase-2 v4.1.0
1996/06 23 p.
GSM Phase-1 v3.2.0
1991/10 23 p.
Rapporteur:
Mr. Hietalahti, Hannu
Nokia Networks Oy
full Table of Contents for
TS 43.005
Word version: 19.0.0
each clause number in
'red'
refers to the equivalent title in the Partial Content
1
Scope
p. 5
1.1
References
p. 5
1.2
Abbreviations
p. 6
2
General
p. 6
3
Performance design objectives
p. 6
3.1
General
p. 6
3.2
MSCs
p. 6
3.2.1
Reference loads
p. 6
3.2.1.1
Reference load on incoming interexchange circuits
p. 6
3.2.1.2
Reference load for MS calls
p. 6
3.2.1.3
Impact of supplementary services
p. 7
3.2.2
Inadequately handled call attempts
p. 7
3.2.2.1
Definition
p. 7
3.2.2.2
Probability of inadequately handled call attempts occurring
p. 7
3.2.3
Delay probability
p. 8
3.2.3.1
User signalling acknowledgement delay
p. 8
3.2.3.2
Signalling transfer delay
p. 8
3.2.3.3
Through connection delay
p. 8
3.2.3.4
Incoming call indication sending delay - (for terminating and internal traffic connections)
p. 9
3.2.3.5
Connection release delay
p. 10
3.2.3.6
Call clearing delay
p. 10
3.2.3.7
Timing for start of charging (circuit switched calls)
p. 10
3.2.3.8
Call set-up delay
p. 10
3.2.3.9
Handover delay
p. 10
3.2.3.10
Off-air-call-set-up (OACSU) delay
p. 11
3.2.3.11
Discontinuous reception mode delay
p. 11
3.2.4
Call processing performance objectives
p. 11
3.2.4.1
Premature release
p. 11
3.2.4.2
Release failure
p. 11
3.2.4.3
Incorrect charging or accounting
p. 11
3.2.4.4
Misrouting
p. 11
3.2.4.5
No tone
p. 11
3.2.4.6
Other failures
p. 12
3.2.4.7
Transmission performance
p. 12
3.2.4.8
Slip rate
p. 12
3.2.5
MSC performance during overload conditions
p. 12
3.3
Performance design objectives for HLRs
p. 12
3.3.1
Reference loads
p. 12
3.3.2
Objectives
p. 12
3.4
Performance design objectives for VLRs
p. 12
3.4.1
Reference loads
p. 12
3.4.2
Objectives
p. 12
4
Transmission characteristics
p. 13
4.1
General
p. 13
4.1.1
BS-MSC path
p. 13
4.1.2
MSC
p. 13
4.2
System delay distribution
p. 13
4.2.1
Speech channel delay
p. 13
4.2.2
Data channel delay
p. 15
$
Change Request History
p. 20