Tech-invite3GPPspaceIETFspace
21222324252627282931323334353637384‑5x
Top   in Index   Prev   Next

TR 36.800
UTRA and E-UTRA –
Extended UMTS / LTE 800

V9.0.0 (Wzip)  2009/09  40 p.
Rapporteur:
Mr. Suwa, Shingo

full Table of Contents for  TR 36.800  Word version:  9.0.0

1Scope  p. 6
2References  p. 6
3Definitions, symbols and abbreviations  p. 7
3.1Definitions  p. 7
3.2Symbols  p. 7
3.3Abbreviations  p. 7
4Background  p. 7
4.1Task description  p. 7
5Study of UTRA Requirements  p. 8
5.1Co-existing with other technologies  p. 8
5.2Technical conditions for UTRA  p. 8
5.3Frequency bands and channel arrangement  p. 8
5.3.1Frequency bands  p. 8
5.3.2TX-RX frequency separation  p. 8
5.3.3Channel arrangement  p. 9
5.3.3.1Channel number  p. 9
5.3.3.2UARFCN  p. 9
5.4Specific UE RF requirements  p. 9
5.4.1Spurious emissions  p. 9
5.4.1.1General spurious emissions requirements  p. 10
5.4.1.2Additional spurious emissions requirements  p. 10
5.4.2Reference sensitivity level  p. 10
5.4.2.1Direction of investigation for UMTS  p. 10
5.4.2.2Evaluation of the reference sensitivity of Band XIX for UMTS.  p. 10
5.4.2.3Proposal of reference sensitivity of Band XIX for UMTS  p. 12
5.4.3Blocking characteristics  p. 12
5.5Specific signalling requirements considering dual band operation  p. 12
6Study of E-UTRA requirements  p. 13
6.1Co-existing with other technologies  p. 13
6.2Technical conditions for E-UTRA  p. 13
6.2.1Mandatory regulatory requirements:  p. 13
6.2.2Other technical conditions referred in Japan's regulations:  p. 17
6.3Operating bands and channel arrangement  p. 20
6.3.1 Operating bands  p. 20
6.3.2TX-RX frequency separation  p. 20
6.3.3Channel arrangement  p. 20
6.3.3.1 Carrier frequency and EARFCN  p. 20
6.3.4Channel bandwidths per operating band  p. 21
6.4Specific UE RF requirements  p. 21
6.4.1Maximum output power with additional requirements  p. 21
6.4.1.1Outline of evaluation method  p. 21
6.4.1.2Outline of Evaluation results  p. 22
6.4.1.2.1Brief overview of measurement results  p. 22
6.4.1.2.2for 5MHz Channel bandwidth cases  p. 23
6.4.1.2.3for 10MHz and 15MHz Channel bandwidth cases  p. 23
6.4.1.3Summary of results  p. 24
6.4.2Spurious emissions  p. 24
6.4.2.1Minimum requirements  p. 25
6.4.2.2Spurious emission band UE co-existence  p. 25
6.4.2.3Additional spurious emissions  p. 25
6.4.3Reference sensitivity power level  p. 26
6.4.3.1Direction of investigation for LTE  p. 26
6.4.3.2Evaluation of the reference sensitivity of Band 18 and Band 19 for LTE  p. 26
6.4.3.3Proposal of reference sensitivity of Band 18 and Band 19 for LTE  p. 26
6.4.3.4Evaluation of maximum uplink configuration of Band 18 and Band 19 for LTE  p. 26
6.4.4Blocking characteristics  p. 27
6.4.4.1In band blocking  p. 27
6.4.4.2Out of band blocking  p. 27
6.5E-UTRA Band 6 handling  p. 27
7Summary of required changes to UTRA specifications  p. 27
7.1Required changes to TS 25.101  p. 27
7.2Required changes to TS 25.104  p. 28
7.3Required changes to TS 25.113  p. 28
7.4Required changes to TS 25.133  p. 29
7.5Required changes to TS 25.141  p. 29
7.6Required changes to TS 34.124  p. 30
7.7Required changes to TS 25.306  p. 30
7.8Required changes to TS 25.307  p. 30
7.9Required changes to TS 25.331  p. 30
7.10Required changes to TS 25.461  p. 30
7.11Required changes to TS 25.466  p. 31
7.12Required changes to TS 34.108  p. 31
7.13Required changes to TS 34.121-1, TS34.121-2  p. 31
7.14Required changes to TS 34.123-1, TS 34.123-2, TS 34.123-3  p. 32
8Summary of required changes to E-UTRA specifications  p. 32
8.1Required changes to TS 36.101  p. 32
8.2Required changes to TS 36.104  p. 33
8.3Required changes to TS 36.113  p. 33
8.4Required changes to TS 36.124  p. 33
8.5Required changes to TS 36.133  p. 34
8.6Required changes to TS 36.141  p. 34
8.7Required changes to TS 36.331  p. 34
8.8Required changes to TS 36.508  p. 34
8.9Required changes to TS 36.521-1, TS 36.521-2, TS 36.521-3  p. 35
8.10Required changes to TS 36.523-1, TS 36.523-2, TS 36.523-3  p. 35
9Project plan  p. 36
9.1Schedule and Work Task Status  p. 36
10Open issues  p. 36
AUARFCN numbers  p. 37
A.1List of UARFCN used for UTRA FDD bands  p. 37
$Change history  p. 40

Top