TR 25.888
Improvement of inter frequency and inter system measurement for 1,28 Mcps TDD

V6.0.0 (Wzip)  2003/10  26 p.
Rapporteur:
Mr. Li, Xiaoqiang

full Table of Contents for  TR 25.888  Word version:  6.0.0

1Scope  p. 5
2References  p. 5
3Definitions, symbols and abbreviations  p. 5
3.1Definitions  p. 6
3.2Symbols  p. 6
3.3Abbreviations  p. 6
4Requirements  p. 6
5Scenarios for improvement  p. 6
6Study Areas  p. 8
6.1Asymmetric pattern for time slot allocation  p. 8
6.2Combination of different time slot allocation pattern  p. 9
7Proposed methods  p. 13
7.1Channel reassigning method  p. 13
7.1.1Overview of proposed channel re-assigning method  p. 13
7.1.2GSM measurement  p. 13
7.1.2.1Asymmetric pattern applying for GSM measurement  p. 13
7.1.2.2Pattern Combination Scheme applying for GSM measurement  p. 14
7.1.3FDD measurement  p. 15
7.1.3.1Asymmetric pattern applying for FDD measurement  p. 15
7.1.3.2Pattern Combination Scheme applying for FDD measurement  p. 16
7.1.43.84Mcps TDD measurement  p. 17
7.1.4.1Asymmetric pattern applying for 3.84Mcps TDD measurement  p. 17
7.1.4.2Pattern Combination Scheme applying for 3.84 Mcps TDD measurement  p. 17
7.1.51.28 Mcps TDD measurement  p. 18
7.1.5.1Asymmetric pattern applying for 1.28 Mcps TDD measurement  p. 18
7.1.5.2Pattern Combination Scheme applying for 1.28 Mcps TDD measurement  p. 18
7.1.6Impacts on other function  p. 18
7.1.6.1Impact on beam-forming  p. 18
7.1.6.2Impact on DCA  p. 20
7.2Other methods  p. 20
7.2.1RNC based implementation method  p. 20
8Conclusions  p. 24
ASimulation Assumptions of monitoring GSM/FDD/3.84Mcps TDD/1.28 Mcps TDD  p. 25
BProject Plan  p. 25
B.1Schedule  p. 25
B.2Work task Status  p. 25
CChange History  p. 26