Tech-invite   3GPPspecs   Glossaries   IETFRFCs   Groups   SIP   ABNFs   Ti+   Search in Tech-invite

Top   in Index   Prev   Next

TR 23.839 (SA2)
Study on support of
Broadband Forum (BBF) access Interworking

3GPP‑Page   full‑ToC    
use "3GPP‑Page" to get the Word version
for a better overview, the Table of Contents (ToC) is reproduced
V12.0.0 (Wzip)  2013/06  179 p.


Rapporteur:  Dr. Rommer, Stefan
See also:

Based on requirements documented in the stage 1 specifications, this technical report addresses system architecture impacts to support BBF Access Interworking. The study includes multiple phases and covers aspects such as basic connectivity, mobility, authentication and authorisation, policy and QoS aspects, IP Flow mobility, traffic offload, convergence etc.

full Table of Contents for  TR 23.839  Word version:   12.0.0

 

Here   Top

 

1  ScopeWord-p. 9
2  References
3  Definitions and abbreviationsWord-p. 10
4  Building Blocks
5  Building Block IWord-p. 12
5.1  Architecture
5.2  Policy and QoS interworking between 3GPP and BBF architectures
5.3  Interworking between 3GPP and BBF architectures for authentication, including identities, when WLAN is usedWord-p. 47
5.4  IP flow mobility support in BBF accessesUp
5.5  Procedures for the case when WLAN is being used
5.5.1  Procedures for untrusted WLAN with traffic routed back to the EPC with S2b
5.5.1.1  Initial Attach with PMIPv6 on S2b
5.5.1.1a  Initial Attach with GTP on S2bWord-p. 51
5.5.1.2  UE/ePDG-initiated Detach Procedure and UE-Requested PDN Disconnection with PMIPv6 on S2bWord-p. 53
5.5.1.2a  UE/ePDG-initiated Detach Procedure and UE-Requested PDN Disconnection with GTP on S2bWord-p. 54
5.5.1.3  HSS/AAA-initiated Detach Procedure with PMIPv6 on S2bWord-p. 55
5.5.1.3a  HSS/AAA-initiated Detach Procedure with GTP on S2bWord-p. 56
5.5.1.4  E-UTRAN to Untrusted Non-3GPP IP Access Handover with PMIPv6 on S2bWord-p. 57
5.5.1.4a  E-UTRAN to Untrusted Non-3GPP IP Access Handover with GTP on S2bWord-p. 59
5.5.1.5  UE-initiated Connectivity to Additional PDN with PMIPv6 or GTP on S2bWord-p. 60
5.5.1.6  Network-Initiated Dynamic PCC for S2b when accessing over BBF accessWord-p. 61
5.5.1.6a  PGW-Initiated Dynamic PCC for GTP based S2b when accessing over BBF accessWord-p. 63
5.5.1.6b  HSS-Initiated Subscribed QoS Modification for GTP based S2b when accessing over BBF access
5.5.1.7  PDN GW initiated Resource Allocation Deactivation with S2b PMIPv6 when accessing over BBF Access NetworkWord-p. 64
5.5.1.7a  PDN GW initiated Resource Allocation Deactivation with S2b GTP when accessing over BBF Access NetworkWord-p. 66
5.5.1.8  Handover without ePDG relocation for PMIPv6 based S2bWord-p. 67
5.5.1.8a  Handover without ePDG relocation for GTP based S2bWord-p. 68
5.5.1.9  IPSec tunnel modified within the same untrusted BBF WLAN IP Accesses with PMIPv6 based S2bWord-p. 69
5.5.1.9a  IPSec tunnel modified within the same untrusted BBF WLAN IP Accesses with GTP based S2bWord-p. 70
5.5.1.10a  Dedicated bearer activation with GTP on S2b
5.5.2  Procedures for trusted BBF WLAN with traffic routed to the EPC with S2cWord-p. 71
5.5.3  Procedures for untrusted BBF WLAN with traffic routed to the EPC with S2cWord-p. 79
5.6  H(e)NB interworking architecture alternative 1Word-p. 87
5.7  H(e)NB interworking architecture alternative 2
5.8  H(e)NB interworking architecture alternative 3Word-p. 104
5.9  Comparison of 3GPP LTE Femto Architecture Options
5.10  3GPP Femto Architecture DecisionWord-p. 117
5.11  ConclusionsWord-p. 121
6  Building Block II
7  Building Block IIIWord-p. 138
8  P4C Building blocks II: Policy and Charging Control for 3GPP UE terminals connected to Broadband Forum access network as Trusted network in Interworking scenarioUp
8.1  Architectural requirements and assumptions
8.2  Key issues
8.3  Alternative Solutions
8.3.1  Alternative 1 - GTP Based S2a Solution
8.3.2  Alternative 2 - PMIP based S2a SolutionWord-p. 164
8.3.3  Alternative 3 - Policy and QoS control via S9a
8.4  Evaluation of alternativesWord-p. 178
8.5  Conclusions
A  Change historyWord-p. 179

Up   Top