Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 36.849
Word version: 13.0.0
1…
2…
2
References
3
Definitions, symbols and abbreviations
4
Background
5
Band plan allocation and regulatory background
6
List of band specific issues for the extension of the AWS Band
7
General issues
8
Study of E-UTRA specific issues
9
Study of MSR specific issues
10
Channel numbering for E-UTRA, MSR
11
Required changes to E-UTRA and MSR specifications
12
Conclusions
$
Change History
2
References
3
Definitions, symbols and abbreviations
3.1
Definitions
3.2
Symbols
Word‑p. 6
3.3
Abbreviations
4
Background
5
Band plan allocation and regulatory background
Word‑p. 7
5.1
Deployment scenarios
6
List of band specific issues for the extension of the AWS Band
7
General issues
Word‑p. 8
7.1
Co-existence with base stations operating in adjacent frequency bands
7.2
Alternative 1: 70+70 MHz band plan
7.3
Alternative 2: 70+90 MHz band plan with variable spacing
7.4
Alternative 3: 85+90 MHz band plan
Word‑p. 9
7.5
Alternative 4: 70+90 MHz band plan with fixed spacing
8
Study of E-UTRA specific issues
8.1
UE duplexer analysis
9
Study of MSR specific issues
Word‑p. 11
10
Channel numbering for E-UTRA, MSR
11
Required changes to E-UTRA and MSR specifications
12
Conclusions
Word‑p. 12
$
Change History
Word‑p. 13