Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 36.846
Word version: 12.0.0
1…
2…
2
References
3
Definitions and abbreviations
4
Background
5
Frequency band arrangements and regulatory background
6
List of band specific issues for the WCS band
7
General issues
8
Study of E-UTRA specific issues
9
Channel numbering for E-UTRA, MSR
10
Required changes to E-UTRA, MSR specifications
$
Change history
2
References
3
Definitions and abbreviations
3.1
Definitions
3.3
Abbreviations
Word‑p. 6
4
Background
5
Frequency band arrangements and regulatory background
Word‑p. 7
5.1
Power limits and duty cycle
5.2
Emission limits
5.3
3GPP requirements in accordance with FCC regulations
Word‑p. 8
6
List of band specific issues for the WCS band
Word‑p. 9
7
General issues
7.1
The FCC out-of-band emissions frequency limits
8
Study of E-UTRA specific issues
Word‑p. 10
8.1
UE transmitter requirements
8.1.1
Output power
8.1.2
UE out-of-band emissions (additional spectrum emissions)
8.1.3
Emission mask and UE coexistence
8.1.4
Network signaling and A-MPR
Word‑p. 15
8.1.5
Emission mask and UE coexistence
8.2
UE receiver requirements
Word‑p. 20
8.2.1
UE REFSENS
8.2.2
UE ACS and blocking
8.2.2.1
SDARS terrestrial repeaters
Word‑p. 21
8.3
Additional spurious emissions
Word‑p. 22
9
Channel numbering for E-UTRA, MSR
Word‑p. 23
9.1
Band and channel numbering for E-UTRA
10
Required changes to E-UTRA, MSR specifications
$
Change history
Word‑p. 24