Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 36.833-8-41
Word version: 13.0.0
1…
2…
2
References
3
Definitions, symbols and abbreviations
4
Background
5
Study of E-UTRA requirements
6
Summary of required changes to E-UTRA specifications
7
Project plan
$
Change History
2
References
3
Definitions, symbols and abbreviations
3.1
Definitions
3.2
Abbreviations
4
Background
4.1
Task description
Word‑p. 6
4.1.1
Objective of the Core Part
4.1.2
Objective of the Performance Part
4.2
Operating scenarios
5
Study of E-UTRA requirements
5.1
Operating bands and channel bandwidths
5.1.1
Operating bands for CA
5.1.2
Channel bandwidths for CA
Word‑p. 7
5.2
Specific UE RF requirements
5.2.1
Reference sensitivity power level
5.2.2
In-band blocking
5.2.3
Out-of-band blocking
5.2.4
UE receiver requirements for new CC combinations
5.3
Specific BS RF requirements
5.4
Specific UE RRM requirements
Word‑p. 8
6
Summary of required changes to E-UTRA specifications
6.1
Required changes to TS36.101
6.2
Required changes to TS36.104
6.3
Required changes to TS36.133
6.4
Required changes to TS36.141
6.5
Required changes to TS36.307
Word‑p. 9
7
Project plan
7.1
Schedule and Work Task Status
$
Change History
Word‑p. 10