Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 36.833-1-38
Word version: 11.1.0
1…
2…
2
References
3
Definitions, symbols and abbreviations
4
Background of the Work Item
5
Band and channel bandwidth arrangement
6
E-UTRA RF requirements for UE
7
E-UTRA RRM requirements for UE
8
E-UTRA RF requirements for BS
9
CA Demodulation performance for BS and UE in Band 38
10
Summary of required changes to E-UTRA specifications
11
Project plan
A
-
$
Change History
2
References
3
Definitions, symbols and abbreviations
3.1
Definitions
3.2
Symbols
Word‑p. 7
3.3
Abbreviations
4
Background of the Work Item
4.1
Task description
4.2
Spectrum and regulatory review
4.3
Coexistence with adjacent bands
Word‑p. 8
4.3.1
Coexistence simulation results for CA single carrier operation
4.3.2
Coexistence simulation results for CA dual carrier operation
4.3.3
Conclusions on the coexistence with the adjacent band
5
Band and channel bandwidth arrangement
5.1
CA Operating bands
5.2
Carrier frequency and EARFCN
5.3
CA channel bandwidth
6
E-UTRA RF requirements for UE
Word‑p. 9
6.1
Required changes for the 5MHz component carriers
6.1.1
Minimum requirements for UE minimum output power
6.1.2
Minimum requirements for UE transmit OFF power
6.2
Out of band emission
6.2.1
General spectrum emission mask
6.3
UE MPR for modulation and CA bandwidth combinations
Word‑p. 10
6.4
UE A-MPR for coexistence with adjacent band
6.4.1
Coexistence requirements with Band 7 for contiguous CA
6.4.2
A-MPR
Word‑p. 11
6.5
UE receiver RF requirements
7
E-UTRA RRM requirements for UE
Word‑p. 12
8
E-UTRA RF requirements for BS
9
CA Demodulation performance for BS and UE in Band 38
10
Summary of required changes to E-UTRA specifications
10.1
Required changes to TS 36.101
10.2
Required changes to TS 36.104
Word‑p. 13
10.3
Required changes to TS 36.133
10.4
Required changes to TS 36.141
10.5
Required changes to TS 36.307
Word‑p. 14
10.6
Required changes to TS 37.104
10.7
Required changes to TS 37.141
11
Project plan
11.1
Schedule and Work Task Status
A
-
Word‑p. 15
A.1
Coexistence simulation results for CA single carrier operation
A.2
Coexistence simulation results for CA dual carrier operation
Word‑p. 19
A.3
A-MPR simulation results 1
Word‑p. 26
A.3.1
Simulation campaign
A.3.2
Simulation results for contiguous allocation
Word‑p. 27
A.3.3
Simulation results for multicluster allocation
Word‑p. 33
A.4
A-MPR simulation results 2
Word‑p. 35
A.4.1
Simulation results for contiguous RB allocations
A.4.2
Simulation results for cluster RB allocations
Word‑p. 39
$
Change History
Word‑p. 43