Tech-
invite
3GPP
space
IETF
space
21
22
23
24
25
26
27
28
29
31
32
33
34
35
36
37
38
4‑5x
Content for
TR 36.811
Word version: 10.0.0
1…
2…
2
References
3
Definitions, symbols and abbreviations
4
Background
5
Study of E-UTRA requirements
6
Summary of required changes to E-UTRA specifications
7
Project plan
8
Open issues
$
Change history
2
References
3
Definitions, symbols and abbreviations
3.1
Definitions
3.2
Symbols
3.3
Abbreviations
4
Background
Word‑p. 7
4.1
Task description
4.2
Regulatory background
4.3
MSS/ATC Bandwidth Deployment Scenarios
Word‑p. 10
5
Study of E-UTRA requirements
Word‑p. 12
5.1
Operating bands and channel arrangement
5.1.1
Frequency bands
5.1.2
Channel bandwidths per operating band
Word‑p. 13
5.1.3
Carrier frequency and EARFCN
5.1.4
TX-RX frequency separation
5.2
Specific UE RF requirements
5.2.1
Dual duplex spacing
5.2.1.1
Signaling support of variable duplex spacing
Word‑p. 14
5.2.1.2
RF architecture
5.2.1.3
Impacts to radio transmission and reception requirements
Word‑p. 15
5.2.1.3.1
Self interference and desense
Word‑p. 16
5.2.1.3.2
Receiver requirements
5.2.1.3.3
Transmitter requirements
5.2.1.3.4
Specification differences between one band and two bands approach
Word‑p. 17
5.2.2
UE Maximum Output Power
5.2.3
UE Maximum Output Power with additional requirements
Word‑p. 18
5.2.3.1
A-MPR Study for frequency range of 2000 - 2010 MHz
5.2.4
Output RF spectrum emissions
Word‑p. 23
5.2.4.1
Additional Spectrum Emission Mask
Word‑p. 25
5.2.4.1.1
Minimum requirement (network signalled value "NS_03" and "NS_11")
5.2.4.2
Spurious Emissions
5.2.4.2.1
Spurious emission band UE co-existence
5.2.5
Receiver characteristics
Word‑p. 26
5.2.5.1
Reference sensitivity power level
5.2.5.1.1
Minimum requirements (QPSK)
5.2.5.2
Requirement for large transmission configurations
Word‑p. 27
5.2.6
Blocking characteristics
5.2.6.1
In-band blocking
5.2.6.1.1
Minimum requirements
5.2.6.2
Out-of-band blocking
Word‑p. 28
5.2.6.2.1
Minimum requirements
5.2.7
UE Co-existence Consideration
Word‑p. 29
5.3
Specific BS RF requirements
Word‑p. 32
5.3.1
Operating band unwanted emissions
5.3.2
Additional spurious emissions requirements
Word‑p. 33
5.3.3
Co-location with other base stations
Word‑p. 34
5.3.4
General blocking requirement
Word‑p. 35
5.3.5
Blocking requirement for co-location with other base stations
6
Summary of required changes to E-UTRA specifications
6.1
Required changes to TS 36.101
6.2
Required changes to TS 36.104
Word‑p. 36
6.3
Required changes to TS 36.113
6.4
Required changes to TS 36.124
Word‑p. 37
6.5
Required changes to TS 36.133
6.6
Required changes to TS 36.141
6.7
Required changes to TS 25.461
Word‑p. 38
6.8
Required changes to TS 25.466
6.9
Required changes to TS 36.307 Version 8.1.0
6.10
Required changes to TS 36.307 Version 9.1.1
6.11
Required changes to TS 25.101
Word‑p. 39
6.12
Required changes to TS 25.104
6.13
Required changes to TS 25.141
6.14
Required changes to TS 37.104
6.15
Required changes to TS 37.141
Word‑p. 40
7
Project plan
8
Open issues
$
Change history