Tech-invite3GPPspaceIETFspace
21222324252627282931323334353637384‑5x

Content for  TS 26.501  Word version:  19.0.0

Top   Top   Up   Prev   Next
1…   4…   4.1…   4.2…   4.3…   4.4   4.5…   4.6…   4.7…   4.8   4.9…   4.10…   4.11…   5…   5.2…   5.2.4   5.2.5…   5.3…   5.3.2…   5.4…   5.5…   5.6…   5.7…   5.7.4…   5.7.8   5.7.9…   5.8…   5.10…   5.10.3   5.10.4   5.10.5…   5.10.6…   5.10.7   5.11…   5.12…   5.12.3   5.12.4…   5.12.5…   5.13…   5.14…   6…   6.2…   6.2.2.2…   6.2.3…   6.3…   6.4…   6.8…   6.9…   6.9.5…   6.9.7   6.9.8…   7…   8…   8.2   9…   A…   A.4…   A.8…   A.11…   A.13…   A.15…   A.16…   B…   C…   D…   E…   F…   G…   G.2…   G.3…   H…

 

8.2  Procedure for AF-driven management of 5GMS Edge Processingp. 229

Figure 8.2-1 outlines a detailed call flow for the AF-driven management of edge processing. In clause 8.1, the optional provisioning of an additional 5GMS AS instance occurs in response to an explicit call from the Application Client to an on-board EEC, whereas in this procedure the provisioning of an additional 5GMS AS instance is initiated by the 5GMS AF. This occurs, if needed, as part of and in response to Application Provider provisioning, and subsequently when needed to support the dynamically changing demands of eligible media streaming sessions. The 5GMS AS instance may also be reprovisioned at any time during the lifetime of the 5GMS Provisioning Session in response to changing demand levels (not illustrated for brevity).
Copy of original 3GPP image for 3GPP TS 26.501, Fig. 8.2-1: AF-driven management of 5GMS edge processing
Up
The Edge Computing Provisioning phase is a provisioning phase, that may be repeated several times (e.g. to extend edge processing coverage to new geographical areas or to increase the capacity of an already provisioned area). All steps in this phase are optional and performed on need basis. Steps 1-4 are identical to those described in clause 8.1 above.
The 5GMS Application Provider Provisioning phase is performed prior to the establishment of any related media streaming sessions by the 5GMS Application Provider. Subsequent updates to the provisioning session are possible. Steps 5-6 are identical to those described in clause 8.1 above.
The optional sub-flow to provision an additional 5GMS AS instance may be repeated multiple times on need basis to add new capacity, to increase existing capacity for edge processing or to reallocate underused edge processing resources to other tasks. The edge processing capacity is tailored for the specific 5GMS Application Provider based on the information in the Provisioning Session. Steps 7-12 are identical to steps 16-21 described in clause 8.1 above with the following exception:
  • In step 7, based on the eligibility criteria in the edge resource template, the 5GMS AF shall determine whether the media streaming session is eligible to use edge resources.
After successful discovery, the actual streaming session may start in the 5GMS Session phase. Steps 13-15 are identical to steps 8-10 described in clause 8.1 above, and steps 16-21 are identical to steps 24-29.
Up

Up   Top   ToC