| 5.1 | Control and user plane p. 43
|
| 5.2 | Device triggering procedures p. 44
| 5.2.1 | Device triggering procedure over Tsp p. 44
|
| 5.2.2 | Trigger Delivery using T4 p. 45
|
| 5.2.3 | Device triggering recall/replace procedures |R12| p. 46
| 5.2.3.1 | Device trigger recall/replace procedure over Tsp p. 46
|
| 5.2.3.2 | Replace procedure for trigger delivery using T4 p. 48
|
| 5.2.3.3 | Recall procedure for trigger delivery using T4 p. 49
|
|
|
| 5.3 | Information Storage p. 50
| 5.3.0 | General |R13| p. 50
|
| 5.3.1 | Trigger Information in SMS-SC (Triggering with T4) p. 50
|
| 5.3.2 | SCEF |R13| p. 50
|
|
| 5.4 | Security Procedures p. 51
|
| 5.5 | Group message delivery procedures |R13| p. 52
| 5.5.1 | Group message delivery using MBMS p. 52
|
| 5.5.2 | Modification of previously submitted Group message |R15| p. 55
|
| 5.5.3 | Group Message Delivery via unicast MT NIDD |R15| p. 56
|
|
| 5.6 | Monitoring Procedures |R13| p. 57
| 5.6.0 | Common Parameters |R15| p. 57
|
| 5.6.1 | Monitoring Event configuration and deletion via HSS p. 58
| 5.6.1.1 | Configuration Procedure p. 58
|
| 5.6.1.2 | Void p. …
|
| 5.6.1.3 | Specific Parameters for Monitoring Event: Loss of connectivity p. 62
|
| 5.6.1.4 | Specific Parameters for Monitoring Event: UE reachability p. 64
|
| 5.6.1.5 | Specific Parameters for Monitoring Event: Location Reporting p. 66
|
| 5.6.1.6 | Specific Parameters for Monitoring Event: Change of IMSI-IMEI(SV) Association p. 67
|
| 5.6.1.7 | Specific Parameters for Monitoring Event: Roaming Status p. 67
|
| 5.6.1.8 | Specific Parameters for Monitoring Event: Communication failure p. 68
|
| 5.6.1.9 | Specific Parameters for Monitoring Event: Availability after DDN Failure p. 68
|
| 5.6.1.10 | Specific Parameters for Monitoring Event: PDN Connectivity Status |R16| p. 68
|
| 5.6.1.11 | Specific Parameters for Store and Forward Satellite operation information |R19| p. 69
|
|
| 5.6.2 | Monitoring Events configuration and deletion directly at the MME/SGSN p. 69
| 5.6.2.1 | Configuration Procedure p. 69
|
| 5.6.2.2 | Void p. …
|
| 5.6.2.3 | Specific Steps for Monitoring Event: Number of UEs present in a geographic area p. 71
|
|
| 5.6.3 | Reporting of Monitoring Events from the HSS or the MME/SGSN p. 72
| 5.6.3.1 | Reporting Procedure p. 72
|
| 5.6.3.2 | Reporting Event: Loss of connectivity p. 73
|
| 5.6.3.3 | Reporting Event: UE reachability p. 74
|
| 5.6.3.4 | Reporting Event: Location Reporting p. 74
|
| 5.6.3.5 | Reporting Event: Change of IMSI-IMEISV association p. 74
|
| 5.6.3.6 | Reporting Event: Roaming Status p. 74
|
| 5.6.3.7 | Reporting Event: Communication failure p. 75
|
| 5.6.3.8 | Reporting Event: Availability after DDN failure p. 75
|
| 5.6.3.9 | Reporting Event: PDN Connectivity Status |R16| p. 75
|
| 5.6.3.10 | Reporting Event: Store and Forward Satellite operation information |R19| p. 75
|
|
| 5.6.4 | Monitoring events configuration and reporting via PCRF p. 76
| 5.6.4.1 | Request of monitoring event reporting p. 76
|
| 5.6.4.1a | Request of monitoring event reporting for a group of UEs |R14| p. 76
|
| 5.6.4.2 | Common Parameters of the request reporting procedure p. 78
|
| 5.6.4.3 | Specific Parameters for Monitoring Event: Location Reporting p. 78
|
| 5.6.4.4 | Specific Parameters for Monitoring Event: Communication Failure p. 79
|
|
| 5.6.5 | Reporting of Monitoring Events from the PCRF p. 79
|
| 5.6.6 | Monitoring Event configuration and deletion via HSS for roaming scenarios using an IWK-SCEF p. 80
| 5.6.6.1 | Configuration Procedure p. 80
|
| 5.6.6.2 | Void p. …
|
| 5.6.6.3 | Specific Parameters for Monitoring Event: Loss of connectivity p. 82
|
| 5.6.6.4 | Specific Parameters for Monitoring Event: UE reachability p. 82
|
| 5.6.6.5 | Specific Parameters for Monitoring Event: Location Reporting p. 83
|
| 5.6.6.6 | Specific Parameters for Monitoring Event: Change of IMSI-IMEI(SV) Association p. 83
|
| 5.6.6.7 | Specific Parameters for Monitoring Event: Roaming Status p. 83
|
| 5.6.6.8 | Specific Parameters for Monitoring Event: Communication failure p. 83
|
| 5.6.6.9 | Specific Parameters for Monitoring Event: Availability after DDN Failure p. 84
|
|
| 5.6.7 | Monitoring Events configuration and deletion directly at the MME/SGSN for roaming scenarios p. 84
|
| 5.6.8 | Reporting of Monitoring Events from the HSS or the MME/SGSN for roaming scenarios p. 84
| 5.6.8.1 | Reporting Procedure p. 84
|
| 5.6.8.2 | Reporting Event: Loss of connectivity p. 86
|
| 5.6.8.3 | Reporting Event: UE reachability p. 86
|
| 5.6.8.4 | Reporting Event: Location Reporting p. 86
|
| 5.6.8.5 | Reporting Event: Change of IMSI-IMEI(SV) association p. 86
|
| 5.6.8.6 | Reporting Event: Roaming Status p. 86
|
| 5.6.8.7 | Reporting Event: Communication failure p. 86
|
| 5.6.8.8 | Reporting Event: Availability after DDN failure p. 87
|
| 5.6.8.9 | Reporting Event: PDN Connectivity Status |R16| p. 87
|
|
| 5.6.9 | Network-initiated Explicit Monitoring Event Deletion Procedure |R15| p. 87
|
|
| 5.7 | High latency communications procedures |R13| p. 88
| 5.7.1 | Availability Notification after DDN Failure p. 88
|
| 5.7.2 | Notification using Monitoring Event "UE Reachability" p. 91
|
|
| 5.8 | Procedure for Informing about Potential Network Issues |R13| p. 91
| 5.8.1 | General p. 91
|
| 5.8.2 | Request procedure for one-time or continuous reporting of network status p. 92
|
| 5.8.3 | Report procedure for continuous reporting of network status p. 93
|
| 5.8.4 | Removal procedure for continuous reporting of network status p. 94
|
|
| 5.9 | Procedure for resource management of background data transfer |R13| p. 95
|
| 5.10 | Communication Pattern parameters provisioning procedure |R13| p. 97
| 5.10.1 | Communication Pattern parameters p. 97
|
| 5.10.2 | Communication Pattern parameters provisioning to the MME p. 98
|
|
| 5.11 | Setting up an AS session with required QoS procedure |R13| p. 99
|
| 5.12 | Change the chargeable party at session set-up or during the session procedure |R13| p. 101
| 5.12.1 | Set the chargeable party at session set-up p. 101
|
| 5.12.2 | Change the chargeable party during the session p. 102
|
|
| 5.13 | Non-IP Data Delivery procedures |R13| p. 103
| 5.13.1 | T6a/T6b Connection Establishment p. 103
| 5.13.1.1 | General p. 103
|
| 5.13.1.2 | T6a/T6b Connection Establishment Procedure p. 103
|
|
| 5.13.2 | NIDD Configuration p. 104
|
| 5.13.3 | Mobile Terminated NIDD procedure p. 106
|
| 5.13.4 | Mobile Originated NIDD procedure p. 109
|
| 5.13.5 | T6a/T6b Connection Release p. 110
| 5.13.5.1 | General p. 110
|
| 5.13.5.2 | MME/SGSN Initiated T6a/T6b Connection Release procedure p. 111
|
| 5.13.5.3 | SCEF Initiated T6a/T6b Connection Release procedure |R14| p. 112
|
|
| 5.13.6 | Serving node relocation procedure over T6a/T6b p. 112
|
| 5.13.7 | Void p. …
|
| 5.13.8 | NIDD Authorisation Update |R14| p. 113
|
|
| 5.14 | PFD management via SCEF |R14| p. 114
| 5.14.1 | Procedure for PFD management via SCEF p. 114
|
| 5.14.2 | PFD definition p. 115
|
|
| 5.15 | Procedure for MSISDN-less MO-SMS via T4 |R14| p. 116
|
| 5.16 | Procedure for Enhanced Coverage Restriction Control via SCEF |R14| p. 117
|
| 5.17 | Procedures for accessing MTC-IWF Functionality via SCEF |R15| p. 118
| 5.17.1 | Device triggering procedure via T8 p. 118
|
| 5.17.2 | Device triggering recall/replace procedures via T8 p. 119
|
| 5.17.3 | Procedure for MSISDN-less MO-SMS via T8 p. 120
|
|
| 5.18 | Procedure for Network Parameter Configuration via SCEF |R15| p. 121
|
| 5.19 | RACS information provisioning procedures |R16| p. 125
| 5.19.1 | General p. 125
|
| 5.19.2 | RACS information provisioning procedures via SCEF p. 125
|
| 5.19.3 | RACS information provisioning procedures via T9a p. 126
|
|