Tech-invite   3GPPspecs   RFCs   Search in Tech-invite

Gen21222324252627282931323334353637384‑5x
FsNEsRPsSBIsIDs Ti+
Top   in Index   Prev   Next

TR 23.723 (SA2) ☆ (Rel-15 draft)
Study of System Level impacts
due to introduction of Light Connection
for LTE in EPS

use "3GPP‑Page" to get the Word version
for a better overview, the Table of Contents (ToC) is reproduced
V0.2.0 (Wzip)  2017/06  37 p.

Rapporteur:  Mr. Stojanovski, Saso

This document is a study into the system level aspects and impact analysis due to the introduction of a power saving substate of RRC CONNECTED (and ECM-CONNECTED) in the RAN known as Light RRC Connection.
The study will identify suitable solutions that allow the Light RRC Connection feature to be considered complete and deployable from a system level perspective. The study is expected to produce an evaluation of Light RRC Connection from a system architecture point of view and a conclusion.

full Table of Contents for  TR 23.723  Word version:   0.2.0

 

Here   Top

 

1  ScopeWord-p. 6
2  References
3  Definitions and Abbreviations
4  Architectural and Functional Requirements
5  List of Issues
5.1  Issue #1: RAN paging failure, potential CN impactWord-p. 8
5.2  Issue #2: UE mobility to 2G/3G and ISR
5.3  Issue #3: Potential CN impact for extended out of coverage: implicit detach, etc.
5.4a  Issue #4a: Handling of Paging Priority indication for MT CS/PS for Light ConnectionUp
5.4b  Issue #4b: Handling of Paging Policy Differentiation for MT PS for Light ConnectionWord-p. 9
5.4c  Issue #4c: Handling of Paging Priority/Policy Differentiation for MT NAS for Light Connection
5.5Void
5.6  Issue #6: UE Reachability
5.7  Issue #7: Handling of MT CSFB/SMS
5.8  Issue #8: HSS impact, potential need for subscription informationWord-p. 10
5.9  Issue #9: Support of eDRX and PSM
5.10  Issue #10: X2 not available, potential need for S1 context fetch
5.11  Issue #11: Handling of NAS messages at inter eNB handover
5.12  Issue #12: CN impacts of successful intra-LTE Light Connected mobilityWord-p. 11
5.13  Issue #13: MME load re-balancingUp
5.14  Issue #14: How RAN can ensure that the negotiated NAS DRX is respected
5.15  Issue #15: Mismatch of states: UE in CONNECTED LC and NW in IDLE
5.16  Issue #16: How to address mismatch of UE and Network states (UE in ECM-IDLE, CN considers the UE in ECM-CONNECTED)
5.17  Issue #17: PLMN selection in Light-Connected stateWord-p. 12
5.18Void
5.19  Issue #19: How to ensure a RAN paging area across TAs and how to ensure same S-GW is used
5.20  Issue #20: RAN paging reliability
5.21  Issue #21: UE Location accuracy and age of location
5.22  Issue #22: UE and network behaviours when moving in LC to a cell for which the eNB does not support LCWord-p. 13
5.23  Issue #23: How to provide CN assistance to RAN for Light RRC Connection activation
5.24  Issue #24: MME needs to provide IMSI mod x to eNB to use for RAN pagingUp
5.25  Issue #25: How HSS can retrieve the UE's cell ID and 'age of location information' with the Insert Subscriber Data
5.26  Issue #26 Excess Signalling and UE power consumption due to frequent UE mobility across RAN based paging area bordersWord-p. 14
5.27  Issue #27: Access Control in Light Connected State
5.28  Issue #28: Impact on MT SMS in MME delivery
5.29  Issue #29: Impact of multi-RAT charging data collection in Dual connectivity casesWord-p. 15
5.30  Issue #30: Inactivity detection in dual connectivity SCG configurationsWord-p. 16
5.31  Issue #31: Paging in dual connectivity Secondary Cell Group configurationsWord-p. 17
5.32  Issue #32: Migration aspects
5.x  Issue #x (new)Word-p. 18
6  SolutionsUp
6.1  Solution #1: UE mobility to 2G/3G and ISR
6.2  Solution #2: Handling Paging Priority
6.3  Solution #3: Handling of MT CSFB/SMS
6.4  Solution #4: No support of eDRX and PSM, with Light Connection
6.5  Solution #5: No support for S1 context fetch
6.6  Solution #6: Handling of NAS messages at inter eNB handover
6.7  Solution #7: Successful intra-LTE Light Connected mobility handling at CN
6.8  Solution #8: RAN needs to ensure that the negotiated NAS DRX is respected
6.9  Solution #9: Triggers for UE NAS recovery
6.10  Solution #10: CN assistance for Light Connection
6.11  Solution #11: Impacts on location information and age of location
6.12  Solution #12: RAN choice put the UE in Light RRC Connected state based on local policy
6.13  Solution #13: UE reachability handling
6.14  Solution #14: MME load balancing
6.15  Solution #15: Background scan for higher priority PLMNsWord-p. 29
6.16  Solution #16: Co-existence with User Plane CIOT EPS Optimisation
6.17  Solution #17: Support for UE Context transfer via S1
6.18  Solution #18: RAN Paging relay via S1
6.19  Solution #19: RAN notifies the CN about the RRC state transitions of the UEWord-p. 34
6.x  Solution #x: <Solution Title>
7  Overall EvaluationWord-p. 35
8  Conclusions
A  References to documents used for SA WG2's initial analysisWord-p. 36
X  Change historyWord-p. 37

Up   Top