tech-invite   World Map     

IETF     RFCs     Groups     SIP     ABNFs    |    3GPP     Specs     Glossaries     Architecture     IMS     UICC    |    search     info

3GPP Glossaries

|   Features_Services   |   Network_Entities   |   Reference_Points   |   SIM_UICC_Dir_Files   |   Identifiers   |

 

Features and Services

Q

R

X

Y

Z

 

 

 

Here          Top

|   CAMEL   |   CAT   |   CB   |   CCBS   |   CCNR   |   CD   |   CDIV   |   CF   |   Charging   |   CIoT   |   CLIP‑CLIR‑COLP‑COLR   |   CNAP   |   CONF   |   CRS   |   CS Core Network   |   CSFB   |   CSICS   |   CTS   |   CUG   |   CW   |

 


TS 02.78   …   TS 22.078     from GSM Rel-96
CAMEL Service definition - Stage 1

TS 03.78   …   TS 23.078     from GSM Rel-96
CAMEL Phase X - Stage 2

TS 09.78   …   TS 29.078     from GSM Rel-96
CAMEL Phase X - CAMEL Application Part (CAP) specification

Up       Top


TS 22.182     from Rel-8
Stage 1

TS 23.173, clause 8.2.21     from Rel-8
MMTEL (MTSI) Stage 1 – Customized Alerting Tone

TS 24.182     from Rel-8
Protocol specification

TS 23.205, clause 14.10     from Rel-8
BICC Core Network: Interaction with CAT

TS 23.231, clause 14.10     from Rel-8
SIP-I based CS core network: Interaction with CAT

TS 23.284, clause 14.10     from Rel-10
Local Call Local Switch: Interaction with CAT

TS 33.106, clause 5.8     from Rel-10
Lawful Interception requirements for CAT

TR 22.982     from Rel-8
Study of CAT requirements

TR 23.872     from Rel-8
Study on architecture of IMS-based CAT

TR 29.882     from Rel-8
CAT in 3G CS Domain

Up       Top


TS 02.88   …   TS 22.088     from GSM Phase-1
Call Barring – Stage 1

TS 03.88   …   TS 23.088     from GSM Phase-1
Call Barring – Stage 2

TS 04.88   …   TS 24.088     from GSM Phase-1
Call Barring – Stage 3

TS 22.173, clause 8.2.10     from Rel-8
MMTEL (MTSI) Stage 1 – Communication Barring

TS 24.611     from Rel-8
ACR and CB using IMS - Protocol specification

Up       Top


TS 02.93   …   TS 22.093     from GSM Rel-97
Completion of Calls to Busy Subscriber – Stage 1

TS 03.93   …   TS 23.093     from GSM Rel-97
Completion of Calls to Busy Subscriber – Stage 2

TS 04.93   …   TS 24.093     from GSM Rel-97
Completion of Calls to Busy Subscriber – Stage 3

TS 22.173, clause 8.2.11     from Rel-8
MMTEL (MTSI) Stage 1 – Completion of Communications to Busy Subscriber

TS 24.642     from Rel-8
Completion of Communications to Busy Subscriber using IMS - Protocol specification

Up       Top


TS 22.173, clause 8.2.23     from Rel-8
MMTEL (MTSI) Stage 1 – Completion of Communications on No Reply

TS 24.642     from Rel-8
Completion of Communications on No Reply using IMS - Protocol specification

Up       Top


TS 02.72   …   TS 22.072     from GSM Rel-98
Call Deflection – Stage 1

TS 03.72   …   TS 23.072     from GSM Rel-98
Call Deflection – Stage 2

TS 04.72   …   TS 24.072     from GSM Rel-98
Call Deflection – Stage 3

TS 22.173, clause 8.2.7     from Rel-8
MMTEL (MTSI) Stage 1 – CDIV: Communication Deflection

TS 24.604     from Rel-8
CDIV using IMS - Protocol specification

Up       Top


TS 22.173, clause 8.2.7     from Rel-8
MMTEL (MTSI) Stage 1 – CDIV

TS 24.604     from Rel-8
CDIV using IMS - Protocol specification

Up       Top


TS 02.82   …   TS 22.082     from GSM Phase-1
Stage 1

TS 03.82   …   TS 23.082     from GSM Phase-1
Stage 2

TS 04.82   …   TS 24.082     from GSM Phase-1
Stage 3

TS 22.173, clause 8.2.7     from Rel-8
MMTEL (MTSI) Stage 1 – CDIV: CFU, CFB, CFNR, CFNL, CFNRc

TS 24.604     from Rel-8
CDIV using IMS - Protocol specification

Up       Top

|   Common   |   Specific   |   Studies   |

TS 22.115     from Rel-3
Charging and Billing – Requirements

TS 32.240     from Rel-6
Charging Architecture and Principles

TS 32.280     from Rel-8
AoC service

TS 32.281     from Rel-13
Announcement service

TS 32.293     from Rel-12
Proxy function

TS 32.295     from Rel-6
CDR transfer

TS 32.296     from Rel-6
OCS Applications and Interfaces

TS 32.297     from Rel-6
CDR file format and transfer

TS 32.298     from Rel-6
CDR parameter description

TS 32.299     from Rel-6
Diameter charging applications

Up       Top

|   Common   |   Specific   |   Studies   |

TS 32.250     from Rel-6
CS Domain Charging

TS 32.251     from Rel-6
PS Domain Charging

TS 32.253     from Rel-13
Control Plane Data Transfer Domain Charging

TS 32.260     from Rel-6
IMS Charging

TS 32.270     from Rel-6
MMS Charging

TS 32.271     from Rel-6
LCS Charging

TS 32.272     from Rel-6
PoC Charging

TS 32.273     from Rel-6
MBMS Charging

TS 32.274     from Rel-8
SMS Charging

TS 32.275     from Rel-8
MMTel Charging

TS 32.276     from Rel-12
VCS Charging

TS 32.277     from Rel-12
ProSe Charging

TS 32.278     from Rel-13
Monitoring Event Charging

Up       Top

|   Common   |   Specific   |   Studies   |

TR 32.815     Rel-6
OCS architecture study

TR 32.820     Rel-8
Study on EPC charging aspects

TR 32.825     Rel-10
Rc reference point study

TR 32.843     Rel-13
Study on Inter-PLMN PS domain online charging

TR 32.844     Rel-12
Study of charging support of ProSe direct communication for public safety use

TR 32.849     Rel-13
Study on Charging aspects of Roaming end-to-end scenarios with VoLTE IMS and interconnecting networks

TR 32.850     Rel-14
Study on determination of completeness of Charging information in IMS

Up       Top


TR 45.820     from Rel-13
Cellular system support for ultra-low complexity and low throughput Internet of Things

TR 33.860     from Rel-13
Study on EGPRS access security enhancements with relation to CIoT

TS 23.008, clause 2.23   and   clause 5.10     from Rel-13
Data related to Cellular IoT Control Plane Optimizations

TS 23.401, Annex L     from Rel-13
Optimized EPS Architecture option for CIoT

TS 29.061, Annex B     from Rel-13
Rate control related to CIoT optimisations

TS 43.020, Annex H     from Rel-13
Access security related functions for EGPRS in relation to CIoT

TS 36.300, clause 7.3a     from Rel-13
CIoT signalling reduction optimizations for NB-IoT

Up       Top


TS 02.81   …   TS 22.081     from GSM Phase-2
Stage 1

TS 03.81   …   TS 23.081     from GSM Phase-2
Stage 2

TS 04.81   …   TS 24.081     from GSM Phase-2
Stage 3

Up       Top


TS 02.96   …   TS 22.096     from GSM Rel-97
Stage 1

TS 03.96   …   TS 23.096     from GSM Rel-97
Stage 2

TS 04.96   …   TS 24.096     from GSM Rel-97
Stage 3

Up       Top


TS 22.173, clause 8.2.13     from Rel-8
MMTEL (MTSI) Stage 1 – CONF

TS 24.605     from Rel-8
CONF using IMS - Protocol specification

Up       Top


TS 22.183     from Rel-9
CRS - Customized Ringing Signal - Stage 1

TS 22.173, clause 8.2.22     from Rel-8
MMTEL (MTSI) Stage 1 – Customized Ringing Signal

TS 24.183     from Rel-9
IMS Customized Ringing Signal (CRS) - Protocol specification

TS 33.106, clause 5.9     from Rel-10
Lawful Interception requirements for CRS

Up       Top

|   BICC   |   SIP‑I   |   LCLS   |

Up       Top

|   BICC   |   SIP‑I   |   LCLS   |

TS 23.205     from Rel-4
Bearer-independent circuit-switched core network - Stage 2

TS 29.205     from Rel-4
Application of Q.1900 series to BICC network architecture - Stage 3

TS 29.232     from Rel-4
Media Gateway Controller (MGC) - Media Gateway (MGW) interface - Stage 3

TS 29.414     from Rel-4
Core network Nb data transport and transport signalling

TS 29.415     from Rel-4
Core network Nb interface user plane protocols

Up       Top

|   BICC   |   SIP‑I   |   LCLS   |

TS 23.231     from Rel-8
SIP-I based CS core network

TS 29.231     from Rel-8
Application of SIP-I Protocols to CS core network architecture

TS 29.164     from Rel-7
Interworking between 3GPP CS Domain with BICC/ISUP and external SIP-I Networks

TS 29.235     from Rel-8
Interworking between SIP-I based CS core network and other networks

TR 29.802     from Rel-8
(G)MSC-S - (G)MSC-S Nc interface based on the SIP-I protocol

Up       Top

|   BICC   |   SIP‑I   |   LCLS   |

TS 23.284     from Rel-10
Stage 2

TS 29.205, Annex C     from Rel-10
LCLS Service Application

TR 23.889     from Rel-10
LCLS system impacts - Feasibility study

Up       Top


TS 23.272     from Rel-8
Circuit Switched (CS) fallback in EPS - Stage 2

TS 29.118     from Rel-8
MME-VLR SGs interface specification

TR 23.879     Rel-9
Study on CS domain services over evolved PS access

TR 23.772     Rel-13
enhanced CSFB

Up       Top


TS 22.279     from Rel-7
Combined CS and IMS sessions - Stage 1

TS 23.279     from Rel-7
Combining CS and IMS Services - Stage 2

TS 24.279     from Rel-7
CSICS - Combining CS and IMS Services - Stage 3

TR 22.979     from Rel-7
Feasibility study on combined CS calls and IMS sessions

TR 24.879     Rel-7
Combining CS calls and IMS sessions

Up       Top


TS 02.56   …   TS 42.056     from GSM Rel-98
GSM CTS, Phase 1 - Service description - Stage 1

TS 03.56     Rel-98
GSM CTS, Phase 1 - CTS Architecture Description

TS 04.56   …   TS 44.056     from GSM Rel-98
GSM CTS, Phase 1 - CTS Radio Interface Layer 3

TS 03.52   …   TS 43.052     from GSM Rel-98
Lower layers of the GSM CTS radio interface - Stage 2

TS 04.57   …   TS 44.057     from GSM Rel-98
GSM CTS supervising system Layer 3

TS 05.56   …   TS 45.056     from GSM Rel-98
CTS-Fixed Part (FP) radio subsystem

Up       Top


TS 02.85   …   TS 22.085     from GSM Phase-2
Stage 1

TS 03.85   …   TS 23.085     from GSM Phase-2
Stage 2

TS 04.85   …   TS 24.085     from GSM Phase-2
Stage 3

TS 22.173, clause 8.2.17     from Rel-8
MMTEL (MTSI) Stage 1 – CUG

TS 24.654     from Rel-8
CUG using IMS - Protocol specification

Up       Top


TS 02.83   …   TS 22.083     from GSM Phase-2
Call Waiting – Stage 1

TS 03.83   …   TS 23.083     from GSM Phase-2
Call Waiting – Stage 2

TS 04.83   …   TS 24.083     from GSM Phase-2
Call Waiting – Stage 3

TS 22.173, clause 8.2.8     from Rel-8
MMTEL (MTSI) Stage 1 – Communication Waiting

TS 24.615     from Rel-8
Communication Waiting using IMS - Protocol specification

Up       Top