tech-invite   World Map
3GPP     Specs     Glossaries     UICC       IETF     RFCs     Groups     SIP     ABNFs       T+       Search     Home
 


 

Here        Top        Up        Prev        Next
part:    1     2     3

 

 

5   Electrical characteristic tests
5.1   Test of the power transition phases
5.1.1   Phase preceding Terminal power on      Up
5.1.2   Phase during UICC power on
5.1.3   Phase during Terminal power off   PDF-p. 23
5.1.4   Warm reset timing   PDF-p. 25
5.1.5   UICC type recognition and voltage switching   PDF-p. 26
5.2   Electrical tests on each Terminal contact   PDF-p. 31      Up
5.2.1   Nominal test conditions
5.2.2   Electrical tests on contact C1
5.2.3   Electrical tests on contact C2
5.2.4   Electrical tests on contact C3
5.2.5   Electrical tests on contact C7

Up        Top        ToC