tech-invite   World Map     

3GPP     Specs     Glossaries     Architecture     IMS     UICC       IETF     RFCs     Groups     SIP     ABNFs       Search

 


 

Here        Top        Up        Prev        Next
part:    1     2     3     4     5     6     7     8     9     10
   11     12     13     14     15     16     17     18     19     20     21     22     23

 

 

26.13   Multislot signalling   Word-p. 2160
26.13.1   Multislot signalling / RR
26.13.1.1   Multislot signalling / RR / Measurement
26.13.1.2   Multislot signalling / RR / Dedicated assignment   Word-p. 2173
26.13.1.3   Test of handover   Word-p. 2242      Up
26.13.1.4   Multislot signalling / RR / Test of the channel mode modify procedure   Word-p. 2291
26.13.1.5   Multislot signalling / RR / Early classmark sending   Word-p. 2293
26.13.1.6   Default contents of layer 3 messages for RR tests   Word-p. 2295
26.13.2   Multislot signalling / CC   Word-p. 2360
26.13.3   Multislot signalling / Structured procedures   Word-p. 2367
26.14   VGCS and VBS Tests   Word-p. 2392      Up
26.14.1   VGCS-VBS / Notification   Word-p. 2393
26.14.2   VGCS-VBS / Paging   Word-p. 2405
26.14.3   VGCS-VBS / RR Procedures   Word-p. 2412
26.14.4   VGCS-VBS / Uplink Access and Uplink Reply Procedures   Word-p. 2437
26.14.5   VGCS-VBS / Leaving Group Receive or Group Transmit Mode   Word-p. 2443
26.14.6   VGCS-VBS / GCC-BCC Procedures   Word-p. 2447
26.14.7   VGCS-VBS / Error Handling   Word-p. 2460
26.14.8   VGCS-VBS / Structured Procedures   Word-p. 2469
26.14.9   VGCS-VBS / Cell change   Word-p. 2472
26.14.10   VGCS-VBS / Default Message Contents   Word-p. 2481
26.14.11   VGCS-VBS / User-to-Dispatcher Information   Word-p. 2485
26.15   SoLSA signalling   Word-p. 2493
26.16   Adaptive Multi Rate Signalling   Word-p. 2524
26.16.0   Default contents of layer 3 messages for AMR signalling tests
26.16.1   Void
26.16.2   Inband Signalling, Uplink Codec Adaptation
26.16.3   Structured procedures / MS terminated call / early assignment / no initial codec mode   Word-p. 2527      Up
26.16.3a   Structured procedures / MS terminated call / early assignment / specified initial codec mode   Word-p. 2530
26.16.4   Structured procedures / MS originated call / late assignment / specified initial codec mode   Word-p. 2533
26.16.4a   Structured procedures / MS originated call / late assignment / no initial codec mode   Word-p. 2536
26.16.5   AMR signalling / Handover / active call / successful case   Word-p. 2539
26.16.6   Structured procedures / emergency call   Word-p. 2555
26.16.7   AMR Signalling / Directed Retry / Mobile Originated Call   Word-p. 2557
26.16.8   AMR Signalling / Directed Retry / Mobile Terminated Call   Word-p. 2561
26.16.9   AMR RATSCCH Protocol   Word-p. 2567
26.16.10   AMR signalling/ test of the channel mode modify procedure   Word-p. 2592      Up
26.16.11   Handover / layer 1 failure   Word-p. 2595
26.17   Adaptive Multi Rate Signalling - 8PSK   Word-p. 2599
26.17.1   Void
26.17.2   Inband Signalling, Uplink Codec Adaptation
26.17.3   8-PSK AMR HR / Structured procedures / MS terminated call / early assignment / no initial codec mode   Word-p. 2601
26.17.3a   8-PSK AMR HR / Structured procedures / MS terminated call / early assignment / specified initial codec mode   Word-p. 2604
26.17.4   8-PSK AMR HR / Structured procedures / MS originated call / late assignment / specified initial codec mode   Word-p. 2607
26.17.4a   8-PSK AMR HR / Structured procedures / MS originated call / late assignment / no initial codec mode   Word-p. 2610
26.17.5   Void
26.17.6   8-PSK AMR HR / Structured procedures / emergency call   Word-p. 2612
26.17.7   Void
26.17.8   Void
26.17.9   8-PSK AMR HR / RATSCCH Protocol   Word-p. 2615
26.17.10   8-PSK AMR HR signalling/ test of the channel mode modify procedure   Word-p. 2640
26.18   Dynamic ARFCN mapping tests   Word-p. 2642
26.19   AMR WB - signalling   Word-p. 2646
26.20   Enhanced Power Control   Word-p. 2692
26.21   VAMOS Signalling   Word-p. 2695
26.22   Test of other features   Word-p. 2719

Up        Top        ToC