tech-invite   World Map     

3GPP     Specs     Glossaries     Architecture     IMS     UICC       IETF     RFCs     Groups     SIP     ABNFs       Search

 


 

Here          Top          Up          Prev          Next
part:    1     2     3     4     5     6     7     8     9

 

 

8.3   Measurement configuration control and reporting   Word-p. 1941
8.3.1   Intra E-UTRAN measurements
8.3.1.1   Measurement configuration control and reporting / Intra E-UTRAN measurements / Event A1
8.3.1.2   Measurement configuration control and reporting / Intra E-UTRAN measurements / Event A2   Word-p. 1946
8.3.1.3   Measurement configuration control and reporting / Intra E-UTRAN measurements / Two simultaneous events A3 (intra and inter-frequency measurements)   Word-p. 1951
8.3.1.3a   Measurement configuration control and reporting / Intra E-UTRAN measurements / Two simultaneous events A3 (intra and inter-frequency measurements) / RSRQ based measurements   Word-p. 1959
8.3.1.4   Measurement configuration control and reporting / Intra E-UTRAN measurements / Periodic reporting (intra and inter-frequency measurements)   Word-p. 1968      Up
8.3.1.5   Measurement configuration control and reporting / Intra E-UTRAN measurements / Two simultaneous event A3 (intra-frequency measurements)   Word-p. 1979
8.3.1.6   Measurement configuration control and reporting / Intra E-UTRAN measurements / Two simultaneous events A2 and A3 (inter-frequency measurements)   Word-p. 1988
8.3.1.7   Measurement configuration control and reporting / Intra E-UTRAN measurements / Blacklisting   Word-p. 1996
8.3.1.8   Measurement configuration control and reporting / Intra E-UTRAN measurements / Handover / IE measurement configuration present   Word-p. 2005
8.3.1.9   Measurement configuration control and reporting / Intra E-UTRAN measurements / Intra-frequency handover / IE measurement configuration not present   Word-p. 2011
8.3.1.9a   Measurement configuration control and reporting / Intra Frequency measurements / Intra-frequency handover / IE measurement configuration not present / Single Frequency operation   Word-p. 2020
8.3.1.10   Measurement configuration control and reporting / Intra E-UTRAN measurements / Inter-frequency handover / IE measurement configuration not present   Word-p. 2025
8.3.1.11   Measurement configuration control and reporting / Intra E-UTRAN measurements / Continuation of the measurements after RRC connection re-establishment   Word-p. 2033
8.3.1.11a   Measurement configuration control and reporting / Intra Frequency measurements / Continuation of the measurements after RRC connection re-establishment / Single Frequency operation   Word-p. 2044
8.3.1.12   Measurement configuration control and reporting / Intra E-UTRAN measurements / Two simultaneous events A3 (inter-band measurements)   Word-p. 2053      Up
8.3.1.12a   Measurement configuration control and reporting / Intra E-UTRAN measurements / Two simultaneous events A3 (inter-band measurements) / Between FDD and TDD   Word-p. 2061
8.3.1.13   Measurement configuration control and reporting / Intra E-UTRAN measurements / Periodic reporting (intra-frequency and inter-band measurements)   Word-p. 2075
8.3.1.13a   Measurement configuration control and reporting / Intra E-UTRAN measurements / Periodic reporting (intra-frequency and inter-band measurements) / Between FDD and TDD   Word-p. 2084
8.3.1.14   Measurement configuration control and reporting / Intra E-UTRAN measurements / Two simultaneous events A2 and A3 (inter-band measurements)   Word-p. 2099
8.3.1.14a   Measurement configuration control and reporting / Intra E-UTRAN measurements / Two simultaneous events A2 and A3 (inter-band measurements) / Between FDD and TDD   Word-p. 2107
8.3.1.15   Measurement configuration control and reporting / Intra E-UTRAN measurements / Inter-band handover / IE measurement configuration not present   Word-p. 2121
8.3.1.15a   Measurement configuration control and reporting / Intra E-UTRAN measurements / Inter-band handover / IE measurement configuration not present / Between FDD and TDD   Word-p. 2129
8.3.1.16   Measurement configuration control and reporting / Intra E-UTRAN measurements / Continuation of the measurements after RRC connection re-establishment / Inter-band   Word-p. 2139
8.3.1.16a   Measurement configuration control and reporting / Intra E-UTRAN measurements / Continuation of the measurements after RRC connection re-establishment / Inter-band / Between FDD and TDD   Word-p. 2149
8.3.1.17   CA / Measurement configuration control and reporting / Intra E-UTRAN measurements / Event A6   Word-p. 2164      Up
8.3.1.18   CA / Measurement configuration control and reporting / Intra E-UTRAN measurements / Additional measurement reporting   Word-p. 2179
8.3.1.19   eICIC/ Measurement configuration control and reporting / CSI change   Word-p. 2191
8.3.1.20   Void
8.3.1.21   eICIC / Measurement configuration control and reporting / Event A4 Handover / Neighbour RSRP and RSRQ measurement configuration change   Word-p. 2196
8.3.1.22   CA / Measurement configuration control and reporting / Intra E-UTRAN measurements / Event A1 / Event A2   Word-p. 2204      Up
8.3.1.23   Measurement configuration control and reporting / Intra E-UTRAN measurements / Event A4
8.3.1.24   Measurement configuration control and reporting / Intra E-UTRAN measurements / Event A5   Word-p. 2220
8.3.1.25   Measurement configuration control and reporting / Intra E-UTRAN measurements / Event A5 / RSRQ based measurements   Word-p. 2227
8.3.1.26   Measurement configuration control and reporting / Intra E-UTRAN measurements / Event A5 (Inter-frequency measurements)   Word-p. 2234
8.3.1.27   Measurement configuration control and reporting / Intra E-UTRAN measurements / Event A5 (Inter-frequency measurements) / RSRQ based measurements   Word-p. 2241
8.3.1.28   eICIC / Measurement configuration control and reporting / Event A1 / RSRP and RSRQ measurement / Serving ABS   Word-p. 2248
8.3.1.29   Measurement configuration control and reporting / Intra E-UTRAN measurements / Event C1   Word-p. 2253      Up
8.3.1.30   Measurement configuration control and reporting / Intra E-UTRAN measurements / Event C2   Word-p. 2262
8.3.1.31   Measurement configuration control and reporting / Intra E-UTRAN measurements / Periodic reporting / CSI-RSRP   Word-p. 2271
8.3.1.32   LAA / Measurement configuration control and reporting / Intra E-UTRAN measurements / RSSI Measurement   Word-p. 2278
8.3.2   Inter-RAT measurements   Word-p. 2282
8.3.2.1   Measurement configuration control and reporting / Inter-RAT measurements / Event B2 / Measurement of GERAN cells
8.3.2.2   Measurement configuration control and reporting / Inter-RAT measurements / Periodic reporting / Measurement of GERAN cells   Word-p. 2289
8.3.2.3   Measurement configuration control and reporting / Inter-RAT measurements / Event B2 / Measurement of UTRAN cells   Word-p. 2296
8.3.2.3a   Measurement configuration control and reporting / Inter-RAT measurements / Event B2 / Measurement of UTRAN cells / RSRQ based measurements   Word-p. 2305
8.3.2.4   Measurement configuration control and reporting / Inter-RAT measurements / Periodic reporting / Measurement of UTRAN cells   Word-p. 2314
8.3.2.5   Measurement configuration control and reporting / Inter-RAT measurements / Periodic reporting / Measurements of E-UTRAN, UTRAN and GERAN cells   Word-p. 2324      Up
8.3.2.6   Measurement configuration control and reporting / Inter-RAT measurements / Simultaneous A2 and two B2 / Measurements of E-UTRAN, UTRAN and GERAN cells   Word-p. 2335
8.3.2.7   Measurement configuration control and reporting / Inter-RAT measurements / Event B2 (measurement HRPD cells)   Word-p. 2344
8.3.2.8   Measurement configuration control and reporting / Inter-RAT measurements / Periodic reporting / Measurement of HRPD cells)   Word-p. 2351
8.3.2.9   Measurement configuration control and reporting / Inter-RAT measurements / Event B2 / Measurement of 1xRTT cells)   Word-p. 2362
8.3.2.10   Measurement configuration control and reporting / Inter-RAT measurements / Periodic reporting / Measurement of 1xRTT cells   Word-p. 2370
8.3.2.11   Measurement configuration control and reporting / Inter-RAT Measurements / Event B1 / Measurement of UTRAN cells   Word-p. 2382
8.3.3   Measurements for self optimized networks   Word-p. 2390
8.3.4   Measurement for CSG, Hybrid and Open cells   Word-p. 2439
8.4   Inter-RAT handover   Word-p. 2490
8.4.1   Inter-RAT handover E-UTRA to UTRA
8.4.2   Inter-RAT handover UTRA to E-UTRA   Word-p. 2501
8.4.3   Inter-RAT mobility E-UTRA to GERAN      Up
8.4.4   Void
8.4.5   Inter-RAT handover E-UTRA to HRPD   Word-p. 2535
8.4.6   Inter-RAT handover HRPD to E-UTRA   Word-p. 2548
8.4.7   Inter-RAT mobility E-UTRA to 1xRTT
8.4.8   WLAN Offload EUTRA RRC Connected   Word-p. 2631
8.5   RRC others   Word-p. 2660
8.5.1   Radio link failure
8.5.2   Redirection to E-UTRAN   Word-p. 2695
8.5.3   Void
8.5.4   UE capability transfer   Word-p. 2700      Up
8.6   Minimization of Drive Test Specific Procedures   Word-p. 2739
8.6.1   Immediate MDT
8.6.2   Logged MDT   Word-p. 2758      Up
8.6.3   Inter-RAT Logged MDT   Word-p. 2854
8.6.4   Logged Radio Link Failure   Word-p. 2886
8.6.5   Inter-RAT Logged Radio Link Failure   Word-p. 2968      Up
8.6.6   Logged Handover Failure   Word-p. 3022
8.6.7   Inter-RAT Logged Handover Failure   Word-p. 3077
8.6.8   Connection Establishment Failure   Word-p. 3131
8.6.9   Inter-RAT Connection Establishment Failure   Word-p. 3159
8.6.10   Inter-RAT Immediate MDT   Word-p. 3180      Up
8.6.11   RACH Optimisation   Word-p. 3184
8.7   Automatic Neighbour Relation (ANR) for UTRAN Specific Procedures   Word-p. 3187
8.8   Void

Up          Top          ToC