tech-invite   World Map
3GPP     Specs     Glossaries     UICC       T+       IETF     RFCs     Groups     SIP     ABNFs       Search     Home
Top        in Index        Prev        Next

TR 32.802 (SA5)
Telecommunication management –
User Equipment Management (UEM) feasibility study

|   ToC   |   3GPP‑Page   |   Help   |

(W-zip) V5.1.0    2002/09    26 p.


Rapporteur:  Mr. Toche, Christian
See also:  –


The scope of this TR is a Release 5 feasibility study that evaluate aspects of User Equipment Management (UEM) which would be beneficial to standardise post-Release-5. For Release 5 this TR does not have a factual impact on other 3GPP Work Items (WIs).

User Equipment (UE) includes both the USIM and Mobile Equipment (ME) domains and so it is emphasised that the scope of UEM includes both the USIM and ME domains.

This TR is focussed on the UEM interface to the UE Over-The-Air (OTA). There is a potential direct interface between the UE Managers and the UE; for example, a user may be able to upgrade the operating system in its UE by taking it to the UE manufacturer's service centre. This direct interface is outside the scope of this TR.

The user interface will be important in delivering UEM. However, the user interface is both outside the scope of this TR and outside the scope of the standardisation of UEM.


 

Here        Top

 

 

1   Scope   Word-p. 6
2   References
3   Definitions and abbreviations   Word-p. 7
4   Possible UEM Requirements   Word-p. 8
5   UEM Capabilities   Word-p. 10
6   Example of a Possible UEM Architecture   Word-p. 18
7   Project planning   Word-p. 20
8   Open issues   Word-p. 21
9   Risks
10   Conclusions
A   Additional UEM Requirements   Word-p. 22      Up
B   Change history   Word-p. 26

Up        Top