tech-invite   World Map     

3GPP     Specs     Glossaries     Architecture     IMS     UICC       IETF     RFCs     Groups     SIP     ABNFs       Search

Top        in Index        Prev        Next

TS 32.426 (SA5)
Performance Management (PM) – Performance measurements –
Evolved Packet Core (EPC) network

|   ToC   |   3GPP‑Page   |   ETSI‑search   |   Help   |

(P) V14.1.0    2017/09    92 p.
(P) V13.0.0    2016/01    89 p.
(P) V12.0.0    2014/10    89 p.
(P) V11.4.0    2013/06    89 p.
(P) V10.5.0    2013/06    64 p.
(P) V9.5.0    2013/06    50 p.
(P) V8.1.0    2010/10    29 p.


Rapporteur:  Mr. Li, Jian
See also:  –


This TS describes the measurements for EPC and combined EPC/UMTS/GSM. TS 32.401 describes Performance Management concepts and requirements. This TS is valid for all measurement types provided by an implementation of an EPC network and combined EPC/UMTS/GSM network. Only measurement types that are specific to EPC or combined EPC/UMTS/GSM networks are defined within this TSs.

Vendor specific measurement types used in EPC and combined EPC/UMTS/GSM networks are not covered. Instead, these could be applied according to manufacturer's documentation.


 

Here        Top        None        None        Next
part:    1     2     3     4     5

 

 

1   Scope   PDF-p. 11
2   References
3   Measurement family and abbreviations   PDF-p. 12
4   Measurements related to the MME
4.1   Mobility Management
4.1.1   EPS attach procedures
4.1.2   UE-initiated EPS Detach procedure   PDF-p. 17
4.1.3   MME-initiated EPS Detach procedure
4.1.4   HSS-initiated EPS Detach procedure
4.1.5   Tracking area update procedure with Serving GW change   PDF-p. 19
4.1.6   Tracking area update procedure without Serving GW change   PDF-p. 20
4.1.7   EPS paging procedures [R10]
4.1.8   MME control of overload related measurements for EPC [R10]
4.1.9   EMM-Registered subscribers
4.1.10   Handover related measurements [R9]   PDF-p. 24
4.1.11   Routeing area update with MME interaction [R9]      Up
4.1.12   Combined TA/LA update procedure [R9]
4.1.13   Number of implicit detach related measurements [R11]
4.2   Session Management   PDF-p. 29
4.3   Subscriber management for MME [R9]
4.4   S1-MME data volume related measurements [R9]   PDF-p. 35
4.5   Void
4.6   S6a related measurements [R11]   PDF-p. 37
4.7   S6a related measurements [R11]   PDF-p. 39

Up        Top        ToC