tech-invite   World Map
3GPP     Specs     Glossaries     Architecture     IMS     UICC       IETF     RFCs     Groups     SIP     ABNFs       Search     Home
Top        in Index        Prev        Next

TS 32.403 (SA5)
Performance Management (PM) – Performance measurements –
UMTS and combined UMTS/GSM

|   ToC   |   3GPP‑Page   |   ETSI‑search   |   Help   |

(P) V6.9.0    2005/10    225 p.
(P) V5.12.0    2005/10    164 p.
(P) V4.10.0    2005/04    118 p.


Rapporteur:  Mr. Toche, Christian
See also:  TS 32.104     TS 32.404     TS 32.405     TS 32.406     TS 32.407     TS 32.408     TS 32.432    


This TS describes the measurements for UMTS and combined UMTS/GSM. TS 32.401 describes Performance Management concepts and requirements. This TS is valid for all measurement types provided by an implementation of a UMTS network and combined UMTS/GSM network.

Only measurement types that are specific to UMTS or combined UMTS/GSM networks are defined within this TSs. Vendor specific measurement types used in UMTS and combined UMTS/GSM networks are not covered. Instead, these could be applied according to manufacturer's documentation.

Measurements related to "external" technologies (such as ATM or IP) as described by "external" standards bodies (e.g. ITU-T or IETF) shall only be referenced within this TS, wherever there is a need identified for the existence of such a reference.

The definition of the standard measurements is intended to result in comparability of measurement data produced in a multi-vendor network, for those measurement types that can be standardised across all vendors' implementations.


 

Here        Top        None        None        Next
part:    1     2     3     4     5     6     7

 

 

1   Scope   PDF-p. 16
2   References
3   Definitions and abbreviations   PDF-p. 17
4   Measurements related to the RNC   PDF-p. 24      Up
4.1   RAB management
4.1.1   Overview
4.1.2   RAB establishment for CS domain
4.1.3   RAB establishmentfor PS domain   PDF-p. 28
4.1.4   RAB modification for CS domain   PDF-p. 30
4.1.5   RAB modification for PS domain
4.1.6   RAB release request by CN for CS domain [R6]
4.1.7   RAB release request by CN for PS domain [R6]   PDF-p. 37
4.1.8   RAB setup time [R6]
4.1.9   RAB release request by UTRAN [R6]   PDF-p. 41
4.2   Void
4.3   Signalling connection establishment   PDF-p. 42
4.4   RRC connection establishment
4.5   RRC connection re-establishment   PDF-p. 45
4.6   RRC connection release
4.7   RLC connection

Up        Top        ToC