tech-invite   World Map     

3GPP     Specs     Glossaries     Architecture     IMS     UICC       IETF     RFCs     Groups     SIP     ABNFs       Search

Top          in Index          Prev          Next

TR 30.820 (SA5)
Telecommunication management –
Project scheduling and open issues for SA5, Release 10

|   ToC   |   3GPP‑Page   |   Help   |

(W-zip) V10.0.0    2011/09    115 p.


Rapporteur:  Ing. Zumerle, Dionisio
See also:  –


The present document contains the up-to-date SA5 Work Item Descriptions (WIDs) and captures the status of all SA5 work items in the current Release.

This TR is used as a mean to provide input to the 3GPP work plan handled by MCC.

Status list of Work items can be found in Annex A of the present document.


 

Here          Top          None          None          Next
part:    1     2

 

 

1   Scope   Word-p. 5
2   References
3   Local IP Access and Selected Internet IP Traffic Offload UID_450035   Word-p. 6
4   IP Flow Mobility and seamless WLAN offload UID_450041   Word-p. 12
4A   Optimal Media Routing UID_460028   Word-p. 18
5   OAM&P 10 UID_460031   Word-p. 22
5.1   Network Infrastructure Management UID_460032      Up
5.2   Self-Organizing Networks OAM aspecsts (OAM-10-SON) UID_ 460034   Word-p. 45
5.3   Subscription Management (SuM) evolution OAM10-SuM UID_470038   Word-p. 57
5.4   Performance Management (OAM10-PM) UID_470039   Word-p. 61
6   Charging Management small Enhancements (CH10) UID_470044   Word-p. 78
7   Advice of Charge (AoC) service support enhancements (eAoC) UID_470046   Word-p. 82      Up

Up          Top          ToC