tech-invite   World Map
3GPP     Specs     Glossaries     UICC       T+       IETF     RFCs     Groups     SIP     ABNFs       Search     Home
Top        in Index        Prev        Next

TR 28.820 (SA5)
Fixed Mobile Convergence (FMC)
Federated Network Operation Model (FNOM)
Umbrella Operation Model (UOM)

|   ToC   |   3GPP‑Page   |   Help   |

(W-zip) V12.0.0    2014/09    24 p.


Rapporteur:  Dr. Pollakowski, Olaf
See also:  –


The present document is the result of the Multi-SDO JWG on Model Alignment which 3GPP TSG SA WG5 (SA5) has developed jointly with TMF and NGMN, and which does not fully follow the 3GPP templates and drafting rules.

Therefore 3GPP SA5 has desired to keep the present document as similar as possible to the original, for comparison with the corresponding TMF version.

Thus 3GPP SA5 has done only the strictly necessary changes from the 3GPP drafting rules perspective in order to publish the present document as a 3GPP Technical Report.

As a result of the analysis of the requirements for the harmonization of the 3GPP and TM Forum Information Models in the context of FMC basic use cases were developed 3GPP TR 32.833, TM Forum TR 166. These use cases led to the recognition that it would be necessary to define common operation model elements applicable for wire-line and wireless networks. The present document defines these common model elements.

To be noted:
  • The Umbrella Operation Model (UOM) described in the present document provides the set of interfaces/operations etc. that have been agreed for convergence to strengthen consistency of representation and semantics of network management operations in the fixed and mobile environments.
  • The UOM is necessary but not sufficient for implementation.
  • The UOM cannot be used directly for implementation. Implementation classes must be derived from those in the UOM by Inheritance or some other appropriate mechanism.
  • Classes derived from those in the UOM (e.g. for the fixed environment) may use different names from those used in the UOM.


 

Here        Top

 

 

1   Scope   Word-p. 6
2   References
3   Definitions, symbols and abbreviations
4   Umbrella Operation Model (UOM)   Word-p. 8
4.1   Introduction
4.2   Interface/Signal diagram
4.3   Operations   Word-p. 9
4.4   Notifications   Word-p. 20      Up
A   Interface/Signal diagrams   Word-p. 21
B   Notification Notify attributes   Word-p. 22
C   Change history   Word-p. 24

Up        Top