Tech-invite3GPPspecsGlossariesIETFRFCsGroupsSIPABNFsWorld Map
Top   in Index   Prev   Next

TS 28.304 (SA5)
Control and monitoring of Power, Energy and Environmental (PEE) parameters
Integration Reference Point (IRP) – Requirements

ToC   3GPP‑Page   ETSI‑search   Help    
V15.0.0 (Wzip)2018/03  15 p.


Rapporteur:  Dr. Cornily, Jean Michel
See also:  –

The present document specifies the requirements for the control and monitoring of Power, Energy and Environmental (PEE) parameters in the following types of Radio Access Networks (RAN): GSM, UTRAN and E-UTRAN.


 

Here   Top