tech-invite   World Map
3GPP     Specs     Glossaries     UICC       T+       IETF     RFCs     Groups     SIP     ABNFs       Search     Home
 


 

Here        Top        Up        Prev        Next
part:    1     2     3     4     5     6     7     8     9     10     11

 

 

8.3   Dedicated Procedures   PDF-p. 51
8.3.1   Radio Link Setup      Up
8.3.2   Radio Link Addition   PDF-p. 88
8.3.3   Radio Link Deletion   PDF-p. 126      Up
8.3.4   Synchronised Radio Link Reconfiguration Preparation
8.3.5   Synchronised Radio Link Reconfiguration Commit   PDF-p. 184      Up
8.3.6   Synchronised Radio Link Reconfiguration Cancellation   PDF-p. 186
8.3.7   Unsynchronised Radio Link Reconfiguration
8.3.8   Physical Channel Reconfiguration   PDF-p. 235
8.3.9   Radio Link Failure
8.3.10   Radio Link Restoration
8.3.11   Dedicated Measurement Initiation
8.3.12   Dedicated Measurement Reporting
8.3.13   Dedicated Measurement Termination
8.3.14   Dedicated Measurement Failure
8.3.15   Downlink Power Control [FDD]
8.3.16   Compressed Mode Command [FDD]
8.3.17   Downlink Power Timeslot Control [TDD]   PDF-p. 248      Up
8.3.18   Radio Link Pre-emption
8.3.19   Radio Link Congestion [R4]
8.3.20   Radio Link Activation [R5]
8.3.21   Radio Link Parameter Update [R5]
8.3.22   UE Measurement Initiation [TDD] [R6]      Up
8.3.23   UE Measurement Reporting [TDD] [R6]
8.3.24   UE Measurement Termination [TDD] [R6]
8.3.25   UE Measurement Failure [TDD] [R6]
8.3.26   Iur Invoke Trace [R6]
8.3.27   Iur Deactivate Trace [R6]
8.3.28   Enhanced Relocation [R8]
8.3.29   Enhanced Relocation Cancel [R8]      Up
8.3.30   Enhanced Relocation Signalling Transfer [R8]
8.3.31   Enhanced Relocation Release [R8]
8.3.32   Secondary UL Frequency Reporting [FDD] [R9]
8.3.33   Secondary UL Frequency Update [FDD] [R9]
8.4   Common Transport Channel Procedures

Up        Top        ToC