tech-invite   World Map
3GPP     Specs     Glossaries     Architecture     IMS     UICC       IETF     RFCs     Groups     SIP     ABNFs       Search     Home
Top        in Index        Prev        Next

TS 25.303 (RAN6)
UTRA – Interlayer procedures in Connected Mode

|   ToC   |   3GPP‑Page   |   ETSI‑search   |   Help   |

(P) V14.0.0    2017/03    77 p.
(P) V13.0.0    2016/01    77 p.
(P) V12.0.0    2014/09    77 p.
(P) V11.0.0    2012/09    77 p.
(P) V10.0.0    2011/03    77 p.
(P) V9.0.0    2010/01    76 p.
(P) V8.0.0    2008/01    77 p.
(P) V7.0.0    2006/04    77 p.
(P) V6.3.0    2005/06    77 p.
(P) V5.3.0    2005/06    76 p.
(P) V4.5.0    2002/06    84 p.
(P) V3.12.0    2002/06    83 p.


Rapporteur:  Mr. SEBIRE, Benoist
See also:  –


This TS describes all procedures that assign, reconfigure and release radio resources. Included are e.g. procedures for transitions between different states and substates, handovers and measurement reports. The emphasis is on showing the combined usage of both peer-to-peer messages and interlayer primitives to illustrate the functional split between the layers, as well as the combination of elementary procedures for selected examples.

The peer-to-peer elementary procedure descriptions and interlayer dependencies are described in the related protocol descriptions TS 25.321, TS 25.322, TS 25.331, and they are thus not within the scope of this TS.

The interlayer procedures and interlayer dependencies in this TS are informative.


 

Here        Top

 

 

1   Scope   PDF-p. 6
2   References
3   Definitions and abbreviations
4   General Description of Connected Mode   PDF-p. 7
5   Radio Bearer Control - Overview of Procedures   PDF-p. 8
6   Examples of procedures
6.1   RRC Connection Establishment and Release Procedures   PDF-p. 11
6.2   Radio Bearer Control Procedures   PDF-p. 17
6.3   Data transmission   PDF-p. 39
6.4   RRC Connection mobility procedures   PDF-p. 41
6.5   CN originated paging request in connected mode   PDF-p. 65
6.6   UTRAN originated paging request and paging response   PDF-p. 67
6.7   Other procedures   PDF-p. 68
7   Traffic volume monitoring   PDF-p. 73
A   Change history   PDF-p. 74

Up        Top