Tech-invite3GPPspecsGlossariesIETFRFCsGroupsSIPABNFsWorld Map



 

Here   Top   Up   Prev   Next
1…      5…   6…   7…   8…   8.4…   9…   9.2   A…   A.5.5   A.5.6…   A.6…   A.8…   A.8.2C…   A.9   B…     

 

 

9.2  Measurements Performance for UTRAN
9.2.1  Received total wideband powerPDF-p. 132
9.2.2  SIRPDF-p. 133
9.2.3  SIRerrorUp
9.2.4  Transmitted carrier powerPDF-p. 134
9.2.5  Transmitted code power
9.2.6Void
9.2.7  Physical channel BERUp
9.2.8  Round trip timePDF-p. 136
9.2.9  Transport Channel BERUp
9.2.10  UTRAN GPS Timing of Cell Frames for UE positioningPDF-p. 138
9.2.11  PRACH Propagation delayPDF-p. 139
9.2.12  Acknowledged PRACH preamblesPDF-p. 140
9.2.13Void
9.2.14Void
9.2.15  SFN-SFN observed time difference [R4]
9.2.16  Transmitted carrier power of all codes not used for HS-PDSCH, HS-SCCH, E-AGCH, E-RGCH or E-HICH transmission [R5]
9.2.17  DL Transmission Branch Load [R6]
9.2.18  Received scheduled E-DCH power share (RSEPS) [R7]PDF-p. 143

Up   Top   ToC