tech-invite   World Map     

3GPP     Specs     Glossaries     Architecture     IMS     UICC       IETF     RFCs     Groups     SIP     ABNFs       Search

 


 

Here        Top        Up        Prev        Next
part:    1     2     3     4     5     6     7     8

 

 

6   Functional Description and Procedures for Trusted Non-3GPP IP Accesses [R8]
6.1   Control and User Plane Protocol Stacks
6.2   Initial Attach on S2a      Up
6.3   Initial Attach Procedure with DSMIPv6 on S2c in Trusted Non-3GPP IP Access   Word-p. 123
6.4   Detach and PDN Disconnection for S2a   Word-p. 126
6.5   Detach and PDN Disconnection for S2c in Trusted Non-3GPP IP Access   Word-p. 134
6.6   Network-initiated Dynamic PCC   Word-p. 138      Up
6.7   UE-initiated Resource Request and Release   Word-p. 140
6.8   UE-initiated Connectivity to Additional PDN
6.9   Void
6.10   PDN GW reallocation upon attach on S2c   Word-p. 146
6.11   S2c Bootstrapping via DSMIPv6 Home Link over a Trusted Access   Word-p. 147
6.12   PDN GW initiated Resource Allocation Deactivation
6.13   PDN GW initiated IPv4 address Delete Procedure   Word-p. 150
6.14   Non-3GPP access initiated IPv4 address Delete Procedure   Word-p. 151      Up
6.15   IPv4 Home Address Release Procedure for S2c   Word-p. 152
6.16   Enhanced security support for S2c [R10]   Word-p. 154

Up        Top        ToC