tech-invite   World Map     

3GPP     Specs     Glossaries     Architecture     IMS     UICC       IETF     RFCs     Groups     SIP     ABNFs       Search

Top          in Index          Prev          Next

TS 23.012 (CT4)
Location Management Procedures

|   ToC   |   3GPP‑Page   |   ETSI‑search   |   Help   |

(P) V14.0.0    2017/03    71 p.
(P) V13.0.0    2015/12    68 p.
(P) V12.0.0    2014/09    67 p.
(P) V11.2.0    2012/12    67 p.
(P) V10.1.0    2011/06    55 p.
(P) V9.1.0    2010/10    54 p.
(P) V8.2.0    2009/09    54 p.
(P) V7.3.0    2007/06    52 p.
(P) V6.4.0    2006/06    49 p.
(P) V5.2.0    2003/10    48 p.
(P) V4.0.0    2001/04    49 p.
(P) V3.3.0    2000/06    49 p.
(P) GSM Rel-98 v7.0.0    1999/06    10 p.
(P) GSM Rel-97 v6.0.0    1998/10    10 p.
(P) GSM Rel-96 v5.0.0    1996/10    11 p.
(W-zip) GSM Phase-2 v4.4.2    1994/09
(P) GSM Phase-1 v3.3.0    1992/02    13 p.


Rapporteur:  Mr. Tamura, Toshiyuki
Antecedent:  TS 03.12    


This TS describes the location management procedures for the circuit switched domain, with respect to the application level functional behaviour. This is to be distinguished from the corresponding protocol handling behaviour, which is specified in TS 29.002. The following location management procedures are included:
  • location updating;
  • location cancellation;
  • MS purging;
  • IMSI attach/detach.
The procedures between MSC, VLR and HLR utilise the Mobile Application Part (MAP) and details concerning the protocol handling are contained in TS 29.002.

This TS excludes location management procedures for the packet switched domain, which are covered in TS 23.060.

The descriptions herein depict a logical separation between the MSC and VLR. This logical separation, as well as the messages transferred between the two logical entities are the basis of a model used to define the externally visible behaviour of the MSC/VLR, which a may be a single physical entity. They do not impose any requirement except the definition of the externally visible behaviour.


 

Here          Top

 

 

1   Scope [R3]   PDF-p. 6
2   Definitions [R3]
3   General procedures in the network related to Location Management [R3]   PDF-p. 9
4   Detailed Procedures in the network related to Location Management [R3]
4.1   Location Updating
4.2   Location Cancellation   PDF-p. 53
4.2A   VCSG Location Cancellation [R11]   PDF-p. 58
4.3   Detach IMSI   PDF-p. 61
4.4   Purge MS   PDF-p. 64
A   Change history   PDF-p. 68

Up          Top